Back
OnGoing Works
S No.
State
District
Block
Panchayat
Work Name (Work Code)
Work Category
Executing Level
Est. labour component(In Lakhs)
Est. material component(In Lakhs)
Actual exp. on labour(In Lakhs)
Actual exp. on material(In Lakhs)
1
MEGHALAYA
EAST KHASI HILLS
MAWLAI
Madan Mawkhar
Construction of Foothpath cum Retaining Wall at Pdengshnong Madan Mawkhar(2102004029/RC/GIS/1573)
Rural Connectivity
GP
2.41
1.18
2.41
1.67
2
MEGHALAYA
EAST KHASI HILLS
MAWLAI
Madan Mawkhar
Construction of CC Road from Arlad to Pynthor(2102004029/RC/GIS/1706)
Rural Connectivity
GP
2.37
1.53
2.37
2.23
3
MEGHALAYA
EAST KHASI HILLS
MAWLAI
Madan Mawkhar
Construction of CC Road near washing place and Side Drain and Retaining wall at Madan Mawkhar(2102004029/RC/GIS/7089)
Rural Connectivity
GP
2.25
1.05
2.25
1.51
4
MEGHALAYA
EAST KHASI HILLS
MAWLAI
Madan Mawkhar
Construction of Rainwater harvesting structure at Madan Mawkhar(2102004029/WC/17805)
Water Conservation and Water Harvesting
GP
0.07
0.16
0.07
0.18
5
MEGHALAYA
EAST KHASI HILLS
MAWLAI
Madan Mawkhar
Construction of Check Dam at Traishnong(2102004029/WC/24826)
Water Conservation and Water Harvesting
GP
3.68
2.39
3.68
3.05
6
MEGHALAYA
EAST KHASI HILLS
MAWLAI
Madan Mawkhar
Construction of Check Dam at Phud Jaklong(2102004029/WC/GIS/29213)
Water Conservation and Water Harvesting
GP
1.56
0.03
1.56
0.03
Total
12.34
6.34
12.34
8.67
Download In Excel