S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
CONSTRUCTION OF RETAINING WALL WITH EARTH FILLING AT BHARALGAON (2105019814/FP/13603) |
On Going |
Gram Panchayat |
Flood Control and Protection |
10.3849801 |
1.0535399 |
0.2161695 |
5.7204743 |
0 |
17.38 |
10.30108 |
0 |
0 |
5.71843 |
0 |
16.01951 |
2 |
Ext of Development of land at Bharalgaon koborstan at BHARALGAON (2105019814/LD/11493) |
On Going |
Gram Panchayat |
Land Development |
8.05504 |
0 |
0 |
0.05 |
0 |
8.11 |
7.99008 |
0 |
0 |
0 |
0 |
7.99008 |
3 |
Community development of land at BHARALGAON (2105019814/LD/13998) |
On Going |
Gram Panchayat |
Land Development |
12.4926002 |
0 |
0 |
0.05 |
0 |
12.54 |
12.4752 |
0 |
0 |
0 |
0 |
12.4752 |
4 |
Const of Road from PWD road to Bodor Ali Residence with Protection wall at BHARALGAON (2105019814/RC/42074) |
On Going |
Gram Panchayat |
Rural Connectivity |
8.9012 |
0 |
0 |
5.8718 |
0 |
14.77 |
8.9012 |
0 |
0 |
5.8718 |
0 |
14.773 |
5 |
Const of road from Soyodur residence to NREGS footpath at BHARALGAON (2105019814/RC/48227) |
On Going |
Gram Panchayat |
Rural Connectivity |
5.78578 |
0 |
0 |
0.05 |
0 |
5.84 |
5.73716 |
0 |
0 |
0 |
0 |
5.73716 |
6 |
Const of road(300m) from Akbar Ali residence to Old Vec culvert with retaining wall AT BHARALGAON (2105019814/RC/53620) |
On Going |
Gram Panchayat |
Rural Connectivity |
10.53620421 |
1.0634684 |
0.1721613 |
4.227377 |
0 |
16 |
10.42711 |
0.79664 |
0.1712 |
4.22737 |
0 |
15.62232 |
7 |
CONSTRUCTION OF CC ROAD FROM ELIMA BEGUM TO HOBIBOR RAHMAN RESIDENCE AT BHARALGAON VEC (2105019814/RC/62485) |
On Going |
Gram Panchayat |
Rural Connectivity |
7.1814451 |
0.6108732 |
0.0110653 |
6.5955252 |
0 |
14.4 |
7.0851 |
0 |
0 |
0 |
0 |
7.0851 |
8 |
Const of Rcc Ringwell 1 no. at BHARALGAON (2105019814/WC/15404) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
1.5147 |
0 |
0 |
1.115 |
0 |
2.63 |
1.5147 |
0 |
0 |
1.115 |
0 |
2.6297 |
|
Grand Total |
|
|
|
64.85 |
2.73 |
0.4 |
23.68 |
0 |
91.67 |
64.43 |
0.8 |
0.17 |
16.93 |
0 |
82.33 |