S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Orange Plantation at Romba Adinggre 2023 2024 (2105015584/DP/GIS/45098) |
On Going |
Gram Panchayat |
Drought Proofing |
1.9524112 |
0 |
0 |
1.2869407 |
0 |
3.24 |
1.70646 |
0 |
0 |
0 |
0 |
1.70646 |
2 |
Construction of CC Road from Monos Residence to Tangsengs residence at Romba Adinggre VEC 2023 2024 (2105015584/RC/GIS/51398) |
On Going |
Gram Panchayat |
Rural Connectivity |
4.8790018 |
0.217728 |
0 |
3.5552067 |
0 |
8.65 |
3.73422 |
0 |
0 |
0 |
0 |
3.73422 |
3 |
Construction of Water tank at Bolchu at Romba Adinggre 2023 2024 (2105015584/WC/GIS/56261) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
2.9274109 |
0.2820303 |
0.0979063 |
1.8547084 |
0 |
5.16 |
0 |
0 |
0 |
0 |
0 |
0 |
|
Grand Total |
|
|
|
9.76 |
0.5 |
0.1 |
6.7 |
0 |
17.05 |
5.44 |
0 |
0 |
0 |
0 |
5.44 |