S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Construction of road from orchards of Mohd Sultan Rather to Orchards of Gh. Nabi Sheikh (1402006007/RC/8808591052) |
On Going |
Gram Panchayat |
Rural Connectivity |
1.0905169 |
0.068341 |
0 |
0.6156453 |
0 |
1.77 |
1.02078 |
0 |
0 |
0.54677 |
0 |
1.56755 |
2 |
Construction of road from H/o Mohd Salim Bhat to orchards at batpora in ward No 01 (1402006007/RC/8808620421) |
On Going |
Gram Panchayat |
Rural Connectivity |
1.7746359 |
0.0823348 |
0 |
0.9959091 |
0 |
2.85 |
1.1804 |
0 |
0 |
0.89174 |
0 |
2.07214 |
3 |
Constt of Vermicompost pit near H/o Ilyas Ahmad Ganie S/o Mohd Ahsan at Minipora at Jadeed (1402006007/RS/8808490268) |
On Going |
Gram Panchayat |
Rural Sanitation |
0.0472708 |
0.0439582 |
0.0176763 |
0.2868023 |
0 |
0.4 |
0.04708 |
0 |
0.05842 |
0.24479 |
0 |
0.35029 |
|
Grand Total |
|
|
|
2.91 |
0.19 |
0.02 |
1.9 |
0 |
5.02 |
2.25 |
0 |
0.06 |
1.68 |
0 |
3.99 |