S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
stone bund nirman kaanmand mandir (1710009036/WC/22012035132009) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
7.4773986 |
0.406567 |
0.0756605 |
4.6897653 |
0 |
12.65 |
0.20332 |
0 |
0 |
0 |
0 |
0.20332 |
2 |
c c rode nirman men rode se bhagvatsingh yadav ke ghar tak (1710009036/RC/22012034650239) |
On Going |
GP-RD Deptt |
Rural Connectivity |
0.57 |
0 |
0 |
0 |
0 |
0.57 |
0.5525 |
0 |
0 |
0 |
0 |
0.5525 |
3 |
C.C.road nirman aagan badi bhavan se mukhay marge tak (1710009036/RC/22012034664951) |
On Going |
GP-RD Deptt |
Rural Connectivity |
0.31 |
0 |
0 |
0 |
0 |
0.31 |
0.2431 |
0 |
0 |
0 |
0 |
0.2431 |
|
Grand Total |
|
|
|
8.36 |
0.41 |
0.08 |
4.69 |
0 |
13.53 |
1 |
0 |
0 |
0 |
0 |
1 |