S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
पुलिया निर्माण सरवनी खुर्द (1717006004/RC/22012034640798) |
On Going |
GP-RD Deptt |
Rural Connectivity |
0.39 |
0 |
0 |
0 |
0 |
0.39 |
0.38755 |
0 |
0 |
0 |
0 |
0.38755 |
2 |
तालाब निर्माण मुक्तिधाम के पास सरवनीखुर्द (1717006004/WC/22012035154803) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
10.7062457 |
0.0069976 |
0.5951981 |
4.7430681 |
0 |
16.05 |
0.09282 |
0 |
0 |
0 |
0 |
0.09282 |
3 |
GREVAL ROAD SARVANIKHURD SE SABALIYA ROUNDI ROAD TAK (1717006004/RC/22012034606782) |
On Going |
GP-RD Deptt |
Rural Connectivity |
6.8412556 |
0.0917417 |
0.026441 |
17.5717995 |
0 |
24.53 |
6.28597 |
0 |
0 |
0 |
0 |
6.28597 |
|
Grand Total |
|
|
|
17.94 |
0.1 |
0.62 |
22.31 |
0 |
40.97 |
6.77 |
0 |
0 |
0 |
0 |
6.77 |