S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Arecanut Plantation at East Malidhar VC Hasti Rung Reang Plot 0.5 (3004002/IF/9422533694) |
On Going |
Horticulture Department |
Works on Individuals Land (Category IV) |
0.2014 |
0 |
0 |
0.035 |
0 |
0.24 |
0.11448 |
0 |
0 |
0.035 |
0 |
0.14948 |
2 |
Construction of Terrace cutting on the land of Dasarat Reang s/o Kharanjoy Reang at Khasmai para (3004002006/IF/9422518617) |
On Going |
Gram Panchayat |
Works on Individuals Land (Category IV) |
1.8261694 |
0 |
0 |
0.09598 |
0 |
1.92 |
1.1439 |
0.0411 |
0 |
0.0357 |
0 |
1.2207 |
3 |
Construction of terrace cutting on the Land of Ganda rung Reang s/o Alen dra Reang at Malidhar Mukh (3004002006/IF/9422518676) |
On Going |
Gram Panchayat |
Works on Individuals Land (Category IV) |
1.6129315 |
0 |
0 |
0.08776 |
0 |
1.7 |
1.30221 |
0.04384 |
0 |
0.04166 |
0 |
1.38771 |
4 |
Construction of Terrace cutting on the land of Sambabati Reang w/o Rambabu Reang at Sailendra Cp (3004002006/IF/9422519009) |
On Going |
Gram Panchayat |
Works on Individuals Land (Category IV) |
1.6129315 |
0 |
0 |
0.08776 |
0 |
1.7 |
0.97125 |
0.0411 |
0 |
0.0357 |
0 |
1.04805 |
5 |
Const. of Earthen Dam on The Land of Bebo ram Reang S/O Birasen Reang Maloydhan C/P (3004002006/IF/9422546910) |
On Going |
Gram Panchayat |
Works on Individuals Land (Category IV) |
1.9980391 |
0.0744 |
0 |
0.0357 |
0 |
2.11 |
1.57248 |
0 |
0 |
0 |
0 |
1.57248 |
|
Grand Total |
|
|
|
7.25 |
0.07 |
0 |
0.34 |
0 |
7.67 |
5.1 |
0.13 |
0 |
0.15 |
0 |
5.38 |