S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
बड़ागांव - परकुलेशन टेंक निर्माण बाबा बारी हार झंको के खेत के पास (1709005024/WC/22012035015682) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
5.5795412 |
0.2528635 |
0 |
2.14149 |
0 |
7.97 |
5.4236 |
0.1645 |
0 |
2.06346 |
0 |
7.65156 |
2 |
बड़ागांव- सी.सी. रोड + नाली निर्माण मानदास के घर से रामजी के घर तक (1709005024/RC/22012034617846) |
On Going |
GP-RD Deptt |
Rural Connectivity |
1.09 |
0 |
0 |
0 |
0 |
1.09 |
0.71604 |
0 |
0 |
0 |
0 |
0.71604 |
3 |
talab bund bistar kary kupariya talab badagon (1709005024/WH/22012034931937) |
On Going |
GP-RD Deptt |
Renovation of traditional water bodies |
4.71 |
0 |
0 |
2.36 |
0 |
7.07 |
4.40732 |
0 |
0 |
0 |
0 |
4.40732 |
4 |
talab bund bistar kary sagra badagaon talab (1709005024/WH/22012034931935) |
On Going |
GP-RD Deptt |
Renovation of traditional water bodies |
4.53 |
0 |
0 |
2.27 |
0 |
6.8 |
4.04806 |
0 |
0 |
0 |
0 |
4.04806 |
|
Grand Total |
|
|
|
15.91 |
0.25 |
0 |
6.77 |
0 |
22.93 |
14.6 |
0.16 |
0 |
2.06 |
0 |
16.82 |