S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Gap Plantation Kallu sohal To Tatle (2601/LD/80467) |
On Going |
Forest |
Land Development |
30 |
0 |
0 |
20 |
0 |
50 |
2.71149 |
0 |
0 |
1.79485 |
0 |
4.50634 |
2 |
Plantation Work Thakar sadhu (2601008119/DP/108176) |
On Going |
Gram Panchayat |
Drought Proofing |
1.479049 |
0 |
0 |
0.020317 |
0 |
1.5 |
0.41109 |
0 |
0 |
0 |
0 |
0.41109 |
3 |
Construction of Ways (2601008119/RC/9989007749) |
On Going |
Gram Panchayat |
Rural Connectivity |
4.7 |
0 |
0 |
10 |
0 |
14.7 |
0.5302 |
0 |
0 |
2.46465 |
0 |
2.99485 |
4 |
Brick Paving On ways Main Road to Dere Thakar sandhu (2601008119/RC/9989038971) |
On Going |
Gram Panchayat |
Rural Connectivity |
1.35 |
0 |
0 |
0 |
0 |
1.35 |
1.29922 |
0 |
0 |
0 |
0 |
1.29922 |
5 |
Brick Paving on ways Thakar sandhu (2601008119/RC/9989038973) |
On Going |
Gram Panchayat |
Rural Connectivity |
1.35 |
0 |
0 |
0 |
0 |
1.35 |
0.38661 |
0 |
0 |
0 |
0 |
0.38661 |
|
Grand Total |
|
|
|
38.88 |
0 |
0 |
30.02 |
0 |
68.9 |
5.34 |
0 |
0 |
4.26 |
0 |
9.6 |