S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Plantation 550(Bhangwan 2019-20) (2601/DP/102690) |
On Going |
Forest |
Drought Proofing |
1.42 |
0 |
0 |
0.05 |
0 |
1.47 |
0.23734 |
0 |
0 |
0 |
0 |
0.23734 |
2 |
Cattel Shed Harjodh Singh/Lakhbir Singh 83 (2601007019/IF/76531) |
On Going |
Gram Panchayat |
Works on Individuals Land (Category IV) |
0.18 |
0 |
0 |
0.79 |
0 |
0.97 |
0.11434 |
0 |
0 |
0 |
0 |
0.11434 |
3 |
Boundary wall of Graveyard(Bhangwan 2021-22) (2601007019/LD/9989022726) |
On Going |
Gram Panchayat |
Land Development |
4.58 |
0 |
0 |
3.06 |
0 |
7.64 |
0.13719 |
0 |
0 |
0 |
0 |
0.13719 |
4 |
Interlock Tiles Shamshanghat to Kabristan way(Bhangwan 2020-21) (2601007019/RC/9989028788) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.31959 |
0 |
0 |
1.67041 |
0 |
1.99 |
0.24479 |
0 |
0 |
0 |
0 |
0.24479 |
|
Grand Total |
|
|
|
6.5 |
0 |
0 |
5.57 |
0 |
12.07 |
0.73 |
0 |
0 |
0 |
0 |
0.73 |