S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Kawapal_Dabri nirman kary(Sukalu/Dhansay)_2020-21 (3311012038/IF/1111491209) |
On Going |
Gram Panchayat |
Works on Individuals Land (Category IV) |
2.6687575 |
0 |
0 |
0.3311499 |
0 |
3 |
2.06777 |
0 |
0 |
0 |
0 |
2.06777 |
2 |
Kawapal_Stop dam nirman kary(2019-20) (3311/WC/1111459362) |
On Going |
Work Deptt. |
Water Conservation and Water Harvesting |
6.709 |
0 |
0 |
17.759 |
0 |
24.47 |
0.1121 |
0 |
0 |
0 |
0 |
0.1121 |
3 |
कावापाल_मिटटी मुरुम सड़क निर्माण कार्य मुख्य सड़क से कावापाल से टाईपदर तक किमी_राशि 43.16_वर्ष 21-22 (3311/RC/1111373467) |
On Going |
Work Deptt. |
Rural Connectivity |
27.67 |
0 |
0 |
15.49 |
0 |
43.16 |
0.21423 |
0 |
0 |
0 |
0 |
0.21423 |
|
Grand Total |
|
|
|
37.05 |
0 |
0 |
33.58 |
0 |
70.63 |
2.39 |
0 |
0 |
0 |
0 |
2.39 |