S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
jungle clearance RD 0-10000 at sarawan drain at viil hari nau 23/24 (2612006/IC/113878) |
On Going |
R.D.Deptt. |
Micro Irrigation Works |
5.58 |
0 |
0 |
0 |
0 |
5.58 |
0.01212 |
0 |
0 |
0 |
0 |
0.01212 |
2 |
Const of recharge pit Doda Distry RD 100R at vill Hari Nou 23/24 (2612006/WC/9989003442) |
On Going |
R.D.Deptt. |
Water Conservation and Water Harvesting |
1.56 |
0 |
0 |
2.13 |
0 |
3.69 |
0.85446 |
0 |
0 |
0.3645 |
0 |
1.21896 |
3 |
Constr recharge pit R.D1050/L OF RUPANA DISTY AT VILL HARI NOU 23/24 (2612006/WC/9989003462) |
On Going |
R.D.Deptt. |
Water Conservation and Water Harvesting |
1.58 |
0 |
0 |
2.17 |
0 |
3.75 |
1.04535 |
0 |
0 |
0.37261 |
0 |
1.41796 |
4 |
PWL 3 Construction of Anganwadi Building for Community at vill Hari Nou 23/24 (2612006070/AV/9989042085) |
On Going |
Gram Panchayat |
Anganwadi/Other Rural Infrastructure |
1.6 |
0 |
0.59 |
5.15 |
0 |
7.34 |
0.79283 |
0.0267 |
0.0267 |
2.49899 |
0 |
3.34522 |
5 |
pwl193Const of Inter-locking tiles Roads for Cmmnity23/24at vill hari nau Roop singh to majer singh (2612006070/RC/GIS/26589) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.4800744 |
0.0460493 |
0.1967664 |
3.6124929 |
0 |
4.34 |
0.12482 |
0 |
0 |
0 |
0 |
0.12482 |
|
Grand Total |
|
|
|
10.8 |
0.05 |
0.79 |
13.06 |
0 |
24.7 |
2.83 |
0.03 |
0.03 |
3.24 |
0 |
6.12 |