S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
soild waste managment at vill behloor kalan (2614005005/RS/9989006620) |
On Going |
Gram Panchayat |
Rural Sanitation |
0.54 |
0 |
0 |
1.03 |
0 |
1.57 |
0.43148 |
0 |
0 |
0 |
0 |
0.43148 |
2 |
const of Reacharge pit at vill Behloor Kalan (2614005005/WC/9988998272) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
0.35 |
0 |
0 |
0.25 |
0 |
0.6 |
0.12912 |
0 |
0 |
0 |
0 |
0.12912 |
3 |
Thapar Model Pond Behloor kalan (2614005005/WH/9989014231) |
On Going |
Gram Panchayat |
Renovation of traditional water bodies |
5.06 |
0 |
0 |
18.2 |
0 |
23.26 |
4.13105 |
0 |
0 |
0 |
0 |
4.13105 |
|
Grand Total |
|
|
|
5.95 |
0 |
0 |
19.48 |
0 |
25.43 |
4.69 |
0 |
0 |
0 |
0 |
4.69 |