S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Const of irrigation canal from Kabo leikai to Heirok Pt 1 Gate mapa ward no 5 and 9 (2005001018/IC/GIS/78273) |
On Going |
Gram Panchayat |
Micro Irrigation Works |
8.07534 |
0 |
0 |
0.3482301 |
0 |
8.42 |
8.0444 |
0 |
0 |
0 |
0 |
8.0444 |
2 |
Const of irrigation pucca drain from Th Manglem lou mapa to Sariloubuk loukon taba ward no 3 (2005001018/IC/GIS/78276) |
On Going |
Gram Panchayat |
Micro Irrigation Works |
0.4251878 |
0.3367682 |
0.0982333 |
6.5621243 |
0 |
7.42 |
0.4004 |
0 |
0 |
0 |
0 |
0.4004 |
3 |
Const of irrigation canal from M Meino lou mapa to Amurou Khongjao taba ward no 5 (2005001018/IC/GIS/78280) |
On Going |
Gram Panchayat |
Micro Irrigation Works |
8.07534 |
0 |
0 |
0.3482301 |
0 |
8.42 |
8.0444 |
0 |
0 |
0 |
0 |
8.0444 |
4 |
Construction of irrigation canal from Amurou Achouba loukon to Lairam taba ward no 6 (2005001018/IC/GIS/81347) |
On Going |
Gram Panchayat |
Micro Irrigation Works |
7.15806 |
0 |
0 |
0.3344709 |
0 |
7.49 |
7.1344 |
0 |
0 |
0 |
0 |
7.1344 |
5 |
Construction of irrigation from O Ibopishak lou mapa to H Ibomcha taba ward no 5 (2005001018/IC/GIS/81348) |
On Going |
Gram Panchayat |
Micro Irrigation Works |
7.15806 |
0 |
0 |
0.3344709 |
0 |
7.49 |
7.098 |
0 |
0 |
0 |
0 |
7.098 |
6 |
Construction of irrigation canal from S Nando mapa to O Netro lou taba ward no 5 (2005001018/IC/GIS/81349) |
On Going |
Gram Panchayat |
Micro Irrigation Works |
7.15806 |
0 |
0 |
0.3344709 |
0 |
7.49 |
7.1344 |
0 |
0 |
0 |
0 |
7.1344 |
7 |
Construction of pucca drain at Surmangol mapa to Sanayaima mapa taba ward no 3 (2005001018/IC/GIS/81350) |
On Going |
Gram Panchayat |
Micro Irrigation Works |
0.5249369 |
0.403848 |
0.116329 |
8.1056288 |
0 |
9.15 |
0.5096 |
0 |
0 |
0 |
0 |
0.5096 |
8 |
Const of irrigation canal from Kh Raghu lou mapa to Laishram Loukon taba ward 2 (2005001018/IC/GIS/87976) |
On Going |
Gram Panchayat |
Micro Irrigation Works |
8.33664 |
0 |
0 |
0.3868696 |
0 |
8.72 |
0.0026 |
0 |
0 |
0 |
0 |
0.0026 |
9 |
Construction of irrigation canal from Mushman khong to L Rajmohon lou taba ward 5 (2005001018/IC/GIS/87977) |
On Going |
Gram Panchayat |
Micro Irrigation Works |
8.33664 |
0 |
0 |
0.3868696 |
0 |
8.72 |
0.0026 |
0 |
0 |
0 |
0 |
0.0026 |
10 |
Construction of irrigation drain at N Ibohal mapa to Th Surmangol mapa ward no 2 (2005001018/IC/GIS/87978) |
On Going |
Gram Panchayat |
Micro Irrigation Works |
0.6718496 |
0.5273931 |
0.1418757 |
10.0791074 |
0 |
11.42 |
0.0026 |
0 |
0 |
0 |
0 |
0.0026 |
11 |
Construction of irrigation canal at W Ibosana lou mapa Lairam taba ward no 5 (2005001018/IC/GIS/90378) |
On Going |
Gram Panchayat |
Micro Irrigation Works |
5.85 |
0 |
0 |
0.28895 |
0 |
6.14 |
0.0026 |
0 |
0 |
0 |
0 |
0.0026 |
12 |
Construction of irrigation canal at Keithemanbi to Ningolbi lok taba ward no 5 (2005001018/IC/GIS/90379) |
On Going |
Gram Panchayat |
Micro Irrigation Works |
5.148 |
0 |
0 |
0.27842 |
0 |
5.43 |
0.0026 |
0 |
0 |
0 |
0 |
0.0026 |
13 |
Const of pucca drain at L Loken mapa to Haridash mapa rad no 1 (2005001018/IC/GIS/90380) |
On Going |
Gram Panchayat |
Micro Irrigation Works |
0.1565491 |
0.1409502 |
0.087318 |
4.2450323 |
0 |
4.63 |
0.0026 |
0 |
0 |
0 |
0 |
0.0026 |
14 |
Renovation of pucca drain at L Shanahal mapa to Kh Mangi mapa ward no 7 (2005001018/IC/GIS/90381) |
On Going |
Gram Panchayat |
Micro Irrigation Works |
0.1565491 |
0.1409502 |
0.087318 |
4.2450323 |
0 |
4.63 |
0.0026 |
0 |
0 |
0 |
0 |
0.0026 |
15 |
Construction of irrigation pucca drain at Tourangbam Kumpham playground surrounding ward no 8 (2005001018/IC/GIS/90385) |
On Going |
Gram Panchayat |
Micro Irrigation Works |
0.1226141 |
0.1117453 |
0.0718502 |
3.554924 |
0 |
3.86 |
0.0026 |
0 |
0 |
0 |
0 |
0.0026 |
16 |
Const of IVR with shingling from Mahadeva mapa to Wabaching taba (2005001018/RC/GIS/78274) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.8995617 |
0 |
0 |
3.6389875 |
0 |
4.54 |
0.8008 |
0 |
0 |
0 |
0 |
0.8008 |
17 |
Construction of IVR with shingling from Thungongching to Inamung taba ward no 2 (2005001018/RC/GIS/81346) |
On Going |
Gram Panchayat |
Rural Connectivity |
1.2126444 |
0 |
0 |
5.8509848 |
0 |
7.06 |
1.2012 |
0 |
0 |
0 |
0 |
1.2012 |
18 |
Construction of IVR from Lai Lam thokpam to Lairampat ward no 5 (2005001018/RC/GIS/90375) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.6063222 |
0 |
0 |
3.3703624 |
0 |
3.98 |
0.0026 |
0 |
0 |
0 |
0 |
0.0026 |
19 |
Construction of community composite pit at Heirok part III Thongkhong ching ward no 1 and 2 (2005001018/RS/GIS/78859) |
On Going |
Gram Panchayat |
Rural Sanitation |
0.2078496 |
0.314206 |
0.1153292 |
3.3626192 |
0 |
4 |
0.195 |
0 |
0 |
3.35899 |
0 |
3.55399 |
|
Grand Total |
|
|
|
70.28 |
1.98 |
0.72 |
56.06 |
0 |
129.01 |
40.59 |
0 |
0 |
3.36 |
0 |
43.94 |