S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
वसुधा वंदन अमृत बाटिका निर्माण स्कूल परिसर (1708005038/DP/22012034593422) |
On Going |
GP-RD Deptt |
Drought Proofing |
0.2792466 |
0 |
0 |
0.2792274 |
0 |
0.56 |
0.2652 |
0 |
0 |
0.27 |
0 |
0.5352 |
2 |
सीसी रोड एवं नाली निर्माण हरदास पटेल के मकान से तिगड्डा तक (1708005038/RC/22012034646545) |
On Going |
GP-RD Deptt |
Rural Connectivity |
0.34 |
0 |
0 |
0 |
0 |
0.34 |
0.26962 |
0 |
0 |
0 |
0 |
0.26962 |
3 |
ANICUT NIRMAN KARY NO.2 GHURA (1708005038/WC/22012035059130) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
1.2014337 |
0.0984471 |
0.0203371 |
3.2598632 |
0 |
4.58 |
1.19363 |
0 |
0 |
3.246 |
0 |
4.43963 |
4 |
एनीकट निर्माण कार्य स्कूल के पास (1708005038/WC/22012035187735) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
0.66 |
0 |
0 |
0 |
0 |
0.66 |
0.65364 |
0 |
0 |
0 |
0 |
0.65364 |
|
Grand Total |
|
|
|
2.48 |
0.1 |
0.02 |
3.54 |
0 |
6.14 |
2.38 |
0 |
0 |
3.52 |
0 |
5.9 |