S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
बॉउण्ड्री वाल निर्माण कार्य प्राथमिक शाला गूगड़ (1712008006/AV/22012034507142) |
On Going |
GP-RD Deptt |
Anganwadi/Other Rural Infrastructure |
0.93 |
0 |
0 |
0 |
0 |
0.93 |
0.66982 |
0 |
0 |
0 |
0 |
0.66982 |
2 |
बॉउण्ड्री वाल निर्माण कार्य EGS School Gugadi (1712008006/AV/22012034507143) |
On Going |
GP-RD Deptt |
Anganwadi/Other Rural Infrastructure |
0.49 |
0 |
0 |
0 |
0 |
0.49 |
0.1904 |
0 |
0 |
0 |
0 |
0.1904 |
3 |
बॉउंड्री वाल निर्माण कार्य आंगनवाड़ी भवन हरदुआसानी (1712008006/AV/22012034574417) |
On Going |
GP-RD Deptt |
Anganwadi/Other Rural Infrastructure |
0.54 |
0 |
0 |
0 |
0 |
0.54 |
0.27743 |
0 |
0 |
0 |
0 |
0.27743 |
4 |
Construction Of Check Dam-दतला नाला (1712008006/WC/22012034427639) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
2.01 |
0 |
0 |
6.29 |
0 |
8.3 |
0.22914 |
0 |
0 |
0 |
0 |
0.22914 |
5 |
CTR - Roof top rain water harvesting in Aaganwadi Bhavan Gugadi (1712008006/WC/22012034705196) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
0.0357976 |
0.0074215 |
0.0058662 |
0.1317195 |
0 |
0.18 |
0.02772 |
0 |
0 |
0.07288 |
0 |
0.1006 |
6 |
सोक पिट एवं प्लेटफार्म निर्माण कार्य - गूगड़, गुगड़ी, हरदुआसानी (1712008006/WC/22012034791170) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
0.34 |
0 |
0 |
0 |
0 |
0.34 |
0.0007 |
0 |
0 |
0 |
0 |
0.0007 |
7 |
PUSKAR DHAROHAR(NREGA + 15TH FINENCE)muthuwa तालाब जीर्णोद्धार (1712008006/WH/22012034921311) |
On Going |
GP-RD Deptt |
Renovation of traditional water bodies |
2.17 |
0 |
0 |
0 |
0 |
2.17 |
0.68897 |
0 |
0 |
0 |
0 |
0.68897 |
|
Grand Total |
|
|
|
6.52 |
0.01 |
0.01 |
6.42 |
0 |
12.95 |
2.08 |
0 |
0 |
0.07 |
0 |
2.16 |