S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Gabiyan Structur 01 g.p.devrikhurd (1745001011/WC/22012034870442) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
0.4282585 |
0.0102106 |
0.0768828 |
1.0306915 |
0 |
1.55 |
0.19485 |
0 |
0 |
0 |
0 |
0.19485 |
2 |
Gabiyan Struchur 02 g.p.devrikhurd (1745001011/WC/22012034870465) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
0.5139212 |
0.0128234 |
0.0946123 |
1.2875633 |
0 |
1.91 |
0.1971 |
0 |
0 |
0 |
0 |
0.1971 |
3 |
Gabiyan Anicut struchur 03 g.p. devrikhurd (1745001011/WC/22012034870506) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
0.5322296 |
0.0147851 |
0.1110376 |
1.4530849 |
0 |
2.11 |
0.18624 |
0 |
0 |
0 |
0 |
0.18624 |
|
Grand Total |
|
|
|
1.47 |
0.04 |
0.28 |
3.77 |
0 |
5.57 |
0.58 |
0 |
0 |
0 |
0 |
0.58 |