S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
CONSTRUCTION OF COMOUND BOUNDARY WALL FOR GOVTGPS KANHERI / XEN PR/ (1218023049/AV/1000006790) |
On Going |
Panchayati Raj Deptt. |
Anganwadi/Other Rural Infrastructure |
0.833 |
0 |
0 |
2.792 |
0 |
3.62 |
0.32748 |
0.182 |
0 |
1.2141 |
0 |
1.72358 |
2 |
CONSTRUCTION OF ILPB PATHWAY IN THE CAMPUS OF GOVT. SCHOOL GGPS KANHERI / XEN PR / KANHERI (1218023049/AV/1000006819) |
On Going |
Panchayati Raj Deptt. |
Anganwadi/Other Rural Infrastructure |
0.283 |
0 |
0 |
1.669 |
0 |
1.95 |
0.00618 |
0 |
0 |
1.58612 |
0 |
1.5923 |
3 |
CONSTRUCTION OF ILPB PATHWAY IN THE CAMPUS OF GOVT. SCHOOL GGMS KANHERI / XEN PR/ KANHERI (1218023049/AV/1000006820) |
On Going |
Panchayati Raj Deptt. |
Anganwadi/Other Rural Infrastructure |
0.783 |
0 |
0 |
4.623 |
0 |
5.41 |
0.27078 |
0 |
0.182 |
3.71792 |
0 |
4.1707 |
4 |
MAINTENANCE OF GAJUWALA MINOR (IRRIGATION/KANHERI/2021-2022) (1218023049/IC/1000020038) |
On Going |
Irrigation Deptt. |
Micro Irrigation Works |
9.67033 |
0 |
0 |
0.72787 |
0 |
10.4 |
1.55696 |
0.03175 |
0 |
0.51809 |
0 |
2.1068 |
5 |
Land Development of Kachha Rasta Field Ways to Village/Kanheri 2021-2022 (1218023049/RC/1000040105) |
On Going |
Gram Panchayat |
Rural Connectivity |
3.9837843 |
0 |
0 |
1.0272566 |
0 |
5.01 |
4.00365 |
0.23211 |
0.02205 |
0.61526 |
0 |
4.87307 |
6 |
LAND LEVELING OF KACHE RASTE FIELD WAY TO VILLAGE KANHERI (1218023049/RC/1000040790) |
On Going |
Gram Panchayat |
Rural Connectivity |
6.1200371 |
0 |
0 |
0.16 |
0.09 |
6.37 |
1.43571 |
0.01564 |
0.0126 |
0.15417 |
0 |
1.61812 |
7 |
PAVEMENT OF RASTA FROM JANTA MIL (THN-HSR) ROAD TO INDER S/O NANAK CHAND FIELD (KANHERI) 2022-23 (1218023049/RC/1000044904) |
On Going |
Gram Panchayat |
Rural Connectivity |
1.5408746 |
0.5593168 |
0.0574993 |
10.4585775 |
0 |
12.62 |
0.8986 |
0.0975 |
0.507 |
8.4588 |
0 |
9.9619 |
|
Grand Total |
|
|
|
23.21 |
0.56 |
0.06 |
21.46 |
0.09 |
45.38 |
8.5 |
0.56 |
0.72 |
16.26 |
0 |
26.05 |