S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
खेत तालाब निर्माण रमेश चंद / बब्बू अहिरवार बरूआ (1708001050/IF/22012035019163) |
On Going |
GP-RD Deptt |
Works on Individuals Land (Category IV) |
2.8594388 |
0 |
0.077616 |
0.6564784 |
0 |
3.59 |
2.79433 |
0 |
0 |
0 |
0 |
2.79433 |
2 |
नंदन फलोद्यान कार्य कौशल किशोर / श्यामलाल यादव (1708001050/IF/22012035128137) |
On Going |
GP-RD Deptt |
Works on Individuals Land (Category IV) |
1.1330975 |
0.0018679 |
0.0005796 |
0.4743798 |
0 |
1.61 |
0.10252 |
0 |
0 |
0 |
0 |
0.10252 |
3 |
नंदन फलोद्यान का लल्लन पिता बल्लू अहिरवार (1708001050/IF/22012035128138) |
On Going |
GP-RD Deptt |
Works on Individuals Land (Category IV) |
1.1330975 |
0.0018679 |
0.0005796 |
0.4743798 |
0 |
1.61 |
0 |
0 |
0 |
0 |
0 |
0 |
4 |
सी.सी. रोड सह नाली निर्माण सौखी प्रजापति के मकान से मौजी प्रजापति के मकान की ओर (1708001050/RC/22012034643187) |
On Going |
GP-RD Deptt |
Rural Connectivity |
0.35 |
0 |
0 |
0 |
0 |
0.35 |
0.29833 |
0 |
0 |
0 |
0 |
0.29833 |
5 |
सीसी रोड सह नाली निर्माण कार्य लक्ष्मण अनुरागी के मकान से जग प्रसाद अहिरवार के मकान तक बरुआ (1708001050/RC/22012034660648) |
On Going |
GP-RD Deptt |
Rural Connectivity |
0.46 |
0 |
0 |
0 |
0 |
0.46 |
0.2135 |
0 |
0 |
0 |
0 |
0.2135 |
6 |
सी.सी. रोड निर्माण राजापाल के मकान से सुरेश पाल के घर तक (1708001050/RC/22012034674869) |
On Going |
GP-RD Deptt |
Rural Connectivity |
0.29 |
0 |
0 |
0 |
0 |
0.29 |
0.05 |
0 |
0 |
0 |
0 |
0.05 |
7 |
नाली निर्माण कार्य राजापाल के मकान से पंचायत भवन की ओर पुलिया तक बरुआ (1708001050/RS/22012035126086) |
On Going |
GP-RD Deptt |
Rural Sanitation |
0.69 |
0 |
0 |
0 |
0 |
0.69 |
0.4131 |
0 |
0 |
0 |
0 |
0.4131 |
|
Grand Total |
|
|
|
6.92 |
0 |
0.08 |
1.61 |
0 |
8.6 |
3.87 |
0 |
0 |
0 |
0 |
3.87 |