S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Pucca Drainage at khayang (2008004019/FP/45649) |
On Going |
Gram Panchayat |
Flood Control and Protection |
1.7753424 |
0.2697468 |
0 |
1.8610825 |
0.18 |
4.09 |
1.6952 |
0 |
0 |
0 |
0 |
1.6952 |
2 |
LAND LEVELLING AT KHAYANG (2008004019/LD/18463) |
On Going |
Gram Panchayat |
Land Development |
18.8508269 |
0 |
0 |
0.9154978 |
0.1 |
19.87 |
18.4912 |
0 |
0 |
0 |
0 |
18.4912 |
3 |
FOTHPATH AT KHAYANG (2008004019/RC/50606) |
On Going |
Gram Panchayat |
Rural Connectivity |
6.0109816 |
0.8218716 |
0 |
3.9627802 |
0.18 |
10.98 |
0.0026 |
0 |
0 |
0 |
0 |
0.0026 |
4 |
IVR ROAD FROM LOCAL TO HARVA SHIMPAM AT KHAYANG PHUNGTHA (2008004019/RC/48778) |
On Going |
Gram Panchayat |
Rural Connectivity |
7.5550747 |
0.0011761 |
0 |
10.19663 |
0.1 |
17.85 |
3.2422 |
0 |
0 |
0 |
0 |
3.2422 |
|
Grand Total |
|
|
|
34.19 |
1.09 |
0 |
16.94 |
0.56 |
52.79 |
23.43 |
0 |
0 |
0 |
0 |
23.43 |