S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
BLOCK SHERPUR GP KALABULA PLANTS GROW AND MAINTENANCE OF PLANTS FY 2023-2024 (2610011008/DP/132412) |
On Going |
Gram Panchayat |
Drought Proofing |
5.5752 |
0.328848 |
0 |
0.946928 |
0 |
6.85 |
5.48127 |
0 |
0 |
0 |
0 |
5.48127 |
2 |
BLOCK SHERPUR GP KALABULA ( PANCHAYTI LAND 3 AREC ) FY 2023-2024 (2610011008/DP/137802) |
On Going |
Gram Panchayat |
Drought Proofing |
6.969 |
0.82212 |
0 |
1.17866 |
0 |
8.97 |
6.96108 |
0 |
0 |
0 |
0 |
6.96108 |
3 |
BLOCK SHERPUR GP KALABULA CONST OF INTERLOCK PAVING FY 2023-24 (2610011008/RC/9989086697) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.1420713 |
0.0106851 |
0.0582409 |
0.8895469 |
0 |
1.1 |
0.05454 |
0 |
0 |
0 |
0 |
0.05454 |
4 |
BLOCK SHERPUR GP KALABULA LAND LEVELING OF KACHA RASTA FY 2023-2024 (2610011008/RC/9989100862) |
On Going |
Gram Panchayat |
Rural Connectivity |
1.5711493 |
0.41106 |
0 |
0.1217126 |
0 |
2.1 |
1.38471 |
0 |
0 |
0 |
0 |
1.38471 |
5 |
BLOCK SHERPUR GP KALABULA RENOVATION OF POND (NEAR GURU GHAR ) 4 LAC FY2023-2024 (2610011008/WH/9989027282) |
On Going |
Gram Panchayat |
Renovation of traditional water bodies |
4 |
0 |
0 |
0 |
0 |
4 |
3.98958 |
0 |
0 |
0 |
0 |
3.98958 |
6 |
BLOCK SHERPUR GP KALABULA RENOVATION OF POND NEAR SC COLONY 6.09 LAC FY 2023-2024 (2610011008/WH/9989027284) |
On Going |
Gram Panchayat |
Renovation of traditional water bodies |
6.09 |
0 |
0 |
0 |
0 |
6.09 |
4.92204 |
0 |
0 |
0 |
0 |
4.92204 |
|
Grand Total |
|
|
|
24.35 |
1.57 |
0.06 |
3.14 |
0 |
29.11 |
22.79 |
0 |
0 |
0 |
0 |
22.79 |