S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Strenting of berm At village Bibipur 2023-24 (2618005017/RC/9989088271) |
On Going |
Gram Panchayat |
Rural Connectivity |
8.0851928 |
0.328848 |
0 |
0.6054552 |
0 |
9.02 |
7.23867 |
0 |
0 |
0 |
0 |
7.23867 |
2 |
Road Side berm At Bibipur (2618005017/RC/9989106786) |
On Going |
Gram Panchayat |
Rural Connectivity |
7.931176 |
0 |
0 |
0.575952 |
0 |
8.51 |
6.38845 |
0 |
0 |
0 |
0 |
6.38845 |
3 |
Renovation of Traditional Water Bodies at Bibipur 2023-24 (2618005017/WH/9989025171) |
On Going |
Gram Panchayat |
Renovation of traditional water bodies |
6.8072189 |
0.328848 |
0 |
0.5139825 |
0 |
7.65 |
6.79629 |
0 |
0 |
0 |
0 |
6.79629 |
|
Grand Total |
|
|
|
22.82 |
0.66 |
0 |
1.7 |
0 |
25.18 |
20.42 |
0 |
0 |
0 |
0 |
20.42 |