S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
land levelling in shamshan ghat with plantation in mayar (1215010027/DP/1000013810) |
On Going |
Gram Panchayat |
Drought Proofing |
1.7960359 |
0.05382 |
0 |
0.077 |
0.01 |
1.94 |
1.48512 |
0.051 |
0 |
0 |
0 |
1.53612 |
2 |
land levelling in khel stadium in mayar (1215010027/LD/1000040611) |
On Going |
Gram Panchayat |
Land Development |
0.8954631 |
0.0621 |
0 |
0.087 |
0.02 |
1.06 |
0.8568 |
0 |
0 |
0 |
0 |
0.8568 |
3 |
land levelling in kabristan and mini bank in mayar (1215010027/LD/1000040613) |
On Going |
Gram Panchayat |
Land Development |
0.461661 |
0.03312 |
0 |
0.085 |
0.02 |
0.6 |
0.40697 |
0 |
0 |
0 |
0 |
0.40697 |
4 |
brick pavement of rasta satbeer son of mana ram to captain son of fakir chand field in mayar (1215010027/RC/1000050163) |
On Going |
Gram Panchayat |
Rural Connectivity |
1.8622548 |
1.0668672 |
0 |
21.3201988 |
0.05 |
24.3 |
0.15351 |
0 |
0 |
0 |
0 |
0.15351 |
5 |
brick pavement of rasta rajender son of munshi field to sattu karwasra field in mayar (1215010027/RC/1000050412) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.6830127 |
0.3912912 |
0 |
7.9335921 |
0.05 |
9.06 |
0.57239 |
0 |
0 |
0 |
0 |
0.57239 |
6 |
digging of fakira pond in mayar (1215010027/WH/39741) |
On Going |
Gram Panchayat |
Renovation of traditional water bodies |
22.0715354 |
0.51336 |
0 |
0.495 |
0.44143 |
23.52 |
12.38076 |
0.51 |
0 |
0 |
0 |
12.89076 |
|
Grand Total |
|
|
|
27.77 |
2.12 |
0 |
30 |
0.59 |
60.48 |
15.86 |
0.56 |
0 |
0 |
0 |
16.42 |