S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
CPT Nirman Barukheda (1741002010/LD/22012034585114) |
On Going |
GP-RD Deptt |
Land Development |
0.4437734 |
0 |
0 |
0.0930168 |
0 |
0.54 |
0.44375 |
0 |
0 |
0 |
0 |
0.44375 |
2 |
Nali nirman Work Gram Bholiyawas me Karu Patel ke makan se Mohansingh ke makan ki or (1741002010/RC/22012034664796) |
On Going |
GP-RD Deptt |
Rural Connectivity |
0.42 |
0 |
0 |
0 |
0 |
0.42 |
0.41897 |
0 |
0 |
0 |
0 |
0.41897 |
3 |
Sudur Sadak Barukheda se Fourline tk (1741002010/RC/22012034635563) |
On Going |
GP-RD Deptt |
Rural Connectivity |
3.5670535 |
0.0200205 |
0.0023151 |
2.6095973 |
0.2 |
6.4 |
2.38462 |
0 |
0 |
0 |
0 |
2.38462 |
4 |
Nala nirman Gram barukheda me Bajrang bali mandir se Shantilal Damami ke makan ki or (1741002010/WC/22012035140880) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
0.39 |
0 |
0 |
0 |
0 |
0.39 |
0.38487 |
0 |
0 |
0 |
0 |
0.38487 |
|
Grand Total |
|
|
|
4.82 |
0.02 |
0 |
2.7 |
0.2 |
7.75 |
3.63 |
0 |
0 |
0 |
0 |
3.63 |