S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
CONSTRUCTION OF FOOD GRAIN STORAGE AT VILLAGE MAZARI (2614004070/AV/9989042672) |
On Going |
Gram Panchayat |
Anganwadi/Other Rural Infrastructure |
0.91 |
0 |
0.47 |
6.08 |
0 |
7.46 |
0.6969 |
0 |
0.468 |
1.7626 |
0 |
2.9275 |
2 |
LAYING OF SILA-PHILKAM AND PLANTATION VILLAGE MAZARI (2614004070/DP/139360) |
On Going |
Gram Panchayat |
Drought Proofing |
1.39 |
0.15 |
0 |
0.19 |
0 |
1.73 |
0.33012 |
0.11817 |
0 |
0 |
0 |
0.44829 |
3 |
ESTIMATE CONSTRUCTION OF STREET AT VILLAGE MAZARI(MAIN ROAD TO PYARA LAL HOUSE) (2614004070/RC/9989104303) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.26 |
0 |
0 |
1.58 |
0 |
1.84 |
0.20964 |
0 |
0 |
0 |
0 |
0.20964 |
4 |
ESTIMATE CONSTRUCTION OF STREET AT VILLAGE MAZARI(WATER TANKI TP POND TAK) (2614004070/RC/9989104304) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.11 |
0 |
0 |
1.08 |
0 |
1.19 |
0.10908 |
0 |
0 |
0 |
0 |
0.10908 |
5 |
ESTIMATE FOR RURAL CONNECTIVITY AT VILLAGE MAZARI(GURMAIL TO KISHAN DE GHAR TAK) (2614004070/RC/9989105246) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.23 |
0 |
0.1 |
1.48 |
0 |
1.81 |
0.21816 |
0 |
0.081 |
0 |
0 |
0.29916 |
|
Grand Total |
|
|
|
2.9 |
0.15 |
0.57 |
10.41 |
0 |
14.03 |
1.56 |
0.12 |
0.55 |
1.76 |
0 |
3.99 |