S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
PLANTATION 754 PLANTS AT VILLAGE CHIDHHOURI (2614002013/DP/140927) |
On Going |
Gram Panchayat |
Drought Proofing |
1.8183192 |
0.102765 |
0 |
0.0788966 |
0 |
2 |
1.19685 |
0 |
0 |
0 |
0 |
1.19685 |
2 |
RURAL CONNECTIVITY H/O SURJIT SINGH S/O RATAN SINGH TO LINK ROAD AT VILLAGE CHIDHHOURI (2614002013/RC/9989104441) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.2498272 |
0.0296051 |
0.0934892 |
1.3979671 |
0 |
1.77 |
0.00303 |
0 |
0 |
0 |
0 |
0.00303 |
3 |
Construction of Solid Waste Management Project Under MG Nrega Convergence at Village Chhidauri (2614002013/RS/9989033439) |
On Going |
Gram Panchayat |
Rural Sanitation |
0.8 |
0 |
0 |
0 |
0 |
0.8 |
0.0606 |
0 |
0 |
0 |
0 |
0.0606 |
4 |
Repairing eroded bandh of Choe by laying soil for the protection of a badies at Village Chidhhouri (2614002013/WC/9989004821) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
8.2959264 |
0.20553 |
0 |
0.6202272 |
0 |
9.12 |
3.12662 |
0 |
0 |
0 |
0 |
3.12662 |
|
Grand Total |
|
|
|
11.16 |
0.34 |
0.09 |
2.1 |
0 |
13.69 |
4.39 |
0 |
0 |
0 |
0 |
4.39 |