S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Khel Medan Vikash Karye Raj.Uch.Mad. Vidhalay Bajwas (2714010364/AV/112908384782) |
On Going |
Gram Panchayat |
Anganwadi/Other Rural Infrastructure |
8.29 |
0.5 |
1 |
8.69 |
0 |
18.48 |
3.0139 |
0.32758 |
0.165 |
2.21301 |
0 |
5.71949 |
2 |
WBM Sadak Nirman karye Paladi Kadwa damar sadak se Dawda ki Dhani v Kumharo ki dhani bajwas tak (2714010364/RC/112908328184) |
On Going |
Work Deptt. |
Rural Connectivity |
12.85 |
0 |
0 |
8.41 |
0 |
21.26 |
11.92614 |
0.3291 |
0.0273 |
5.20666 |
0 |
17.4892 |
3 |
ग्रेवल सड़क निर्माण डेगाना रोड से गुजरो वाला बेरा तक दो किलोमीटर (2714010364/RC/112908346314) |
On Going |
Gram Panchayat |
Rural Connectivity |
9.0215731 |
0.4465 |
0 |
4.8856701 |
0 |
14.35 |
8.98355 |
0.3901 |
0 |
2.4327 |
0 |
11.80635 |
4 |
ग्रेवल सड़क निर्माण गोरिडा नाडा से इमरतिया बेरा तक 1.5 किओलोमीटर बाजवाश (2714010364/RC/112908346321) |
On Going |
Gram Panchayat |
Rural Connectivity |
3.1706976 |
0.29375 |
0 |
3.6305746 |
0 |
7.1 |
2.76654 |
0.16685 |
0 |
1.83958 |
0 |
4.77297 |
5 |
डब्ल्यू बी एम सडक निर्माण कार्य बिसास से ढाढोता सीमा तक किमी 0/0 से 2/500 बिसास बाजवास (2714010364/RC/112908353062) |
On Going |
Work Deptt. |
Rural Connectivity |
29.94 |
2 |
0 |
17.85 |
0 |
49.79 |
28.72335 |
0.93435 |
0 |
10.13278 |
0 |
39.79048 |
|
Grand Total |
|
|
|
63.27 |
3.24 |
1 |
43.47 |
0 |
110.98 |
55.41 |
2.15 |
0.19 |
21.82 |
0 |
79.58 |