S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
सीवरेज मयनाला निर्माण कार्य ग्रामपंचायत सरवडी(MLALADयोजना केकार्य खेताजीकाला केघर से रविन्द्र उद्धन) (2717008391/AV/112908425940) |
On Going |
Gram Panchayat |
Anganwadi/Other Rural Infrastructure |
2.18 |
0.29 |
2.6 |
8 |
0 |
13.07 |
0.34635 |
0 |
0.045 |
3.77666 |
0 |
4.16801 |
2 |
Construction of PMAY-G House for Individuals -PMAY-G REG. NO. RJ132379470 (2717008391/IF/IAY/1957343) |
On Going |
Gram Panchayat |
Works on Individuals Land (Category IV) |
0.1989 |
0 |
0 |
0 |
0 |
0.2 |
0.16974 |
0 |
0 |
0 |
0 |
0.16974 |
3 |
आदर्श तालब खुदाई कार्य फेज़ २ गोलिया चौधरीयान (2717008391/WC/112908690067) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
22.9945935 |
1.1475 |
0 |
0.3897917 |
0 |
24.53 |
7.79415 |
0.0329 |
0.0282 |
0 |
0 |
7.85525 |
4 |
सोलंकिया नाडा खुदाई मय पिचिंग कार्य फेज़ २ (2717008391/WC/GIS/102310) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
20.7790397 |
0.64625 |
0 |
0.2754467 |
0 |
21.7 |
13.8089 |
0.13535 |
0.05405 |
0 |
0 |
13.9983 |
|
Grand Total |
|
|
|
46.15 |
2.08 |
2.6 |
8.67 |
0 |
59.5 |
22.12 |
0.17 |
0.13 |
3.78 |
0 |
26.19 |