S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
E/Filling & const of IBP street from pwd road to Rohera Minor {Khei Simbal Wali} (1204004002/RC/1000029755) |
On Going |
Gram Panchayat |
Rural Connectivity |
1.5348357 |
0.225858 |
0.0746964 |
8.0758801 |
0 |
9.91 |
0.441 |
0 |
0 |
0 |
0 |
0.441 |
2 |
E/Filling & const of street from Rammehar s/o Dariya to Barsati s/o Layak Ram {Kheri Simbal Wali} (1204004002/RC/1000029757) |
On Going |
Gram Panchayat |
Rural Connectivity |
1.3866155 |
0.2457151 |
0.0457519 |
6.888026 |
0 |
8.57 |
0.567 |
0.0448 |
0 |
0.37751 |
0 |
0.98931 |
3 |
E/Filling & const of street from Kapoor s/o Arjun to Randhir s/o Gyani{Kheri Simbal Wali} (1204004002/RC/1000029758) |
On Going |
Gram Panchayat |
Rural Connectivity |
2.1053904 |
0.2181236 |
0.0786198 |
7.5424062 |
0 |
9.94 |
1.76994 |
0 |
0.26656 |
0.44993 |
0 |
2.48643 |
|
Grand Total |
|
|
|
5.03 |
0.69 |
0.2 |
22.51 |
0 |
28.42 |
2.78 |
0.04 |
0.27 |
0.83 |
0 |
3.92 |