S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
construction of Play Ground at Village- PHIRNI MAZARA (2614002052/AV/9989012288) |
On Going |
Gram Panchayat |
Anganwadi/Other Rural Infrastructure |
3.18 |
0 |
0 |
6.82 |
0 |
10 |
2.90717 |
0 |
0 |
0 |
0 |
2.90717 |
2 |
RURAL CONNECTIVITY VILLAGE TO LINK ROAD AT VILLAGE PHIRNI MAZARA (2614002052/RC/9989006591) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.49041 |
0 |
0 |
1.50949 |
0 |
2 |
0.10122 |
0 |
0.015 |
1.1682 |
0 |
1.28442 |
3 |
DISPOSAL OF SULLAGE WATER BY RCC PIPE PHIRNI MAJARA (2614002052/WC/20921) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
0.33529 |
0 |
0 |
1.33497 |
0 |
1.67 |
0.0096 |
0 |
0 |
0.9775 |
0 |
0.9871 |
|
Grand Total |
|
|
|
4.01 |
0 |
0 |
9.66 |
0 |
13.67 |
3.02 |
0 |
0.02 |
2.15 |
0 |
5.18 |