S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
कच्ची नाली निर्माण कार्य इंदिरा आवास से दुधई फाल्या की और (1725005033/RC/22012034571214) |
On Going |
GP-RD Deptt |
Rural Connectivity |
3.6174762 |
0 |
0 |
0.5136768 |
0 |
4.13 |
2.87436 |
0 |
0 |
0 |
0 |
2.87436 |
2 |
नालाविस्तारीकरण कार्य दुलीचंद के खेत के पास माथनी बुजुर्ग (1725005033/WC/22012034945500) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
4.9832563 |
0 |
0 |
0.7076182 |
0 |
5.69 |
4.28669 |
0 |
0 |
0 |
0 |
4.28669 |
3 |
चेकडेम नाला गहरीकरण सुरपाल सर के खेत के पास माथनी बुजुर्ग (1725005033/WC/22012034953038) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
3.9608592 |
0 |
0.0739802 |
0.5569169 |
0 |
4.59 |
2.60712 |
0 |
0 |
0 |
0 |
2.60712 |
|
Grand Total |
|
|
|
12.56 |
0 |
0.07 |
1.78 |
0 |
14.41 |
9.77 |
0 |
0 |
0 |
0 |
9.77 |