S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Drought Proofing 2023-24 8.35 talwandi rai (2604012044/DP/135006) |
On Going |
Forest |
Drought Proofing |
8.2 |
0.1 |
0 |
0.01 |
0 |
8.31 |
2.22188 |
0 |
0 |
0.01 |
0 |
2.23188 |
2 |
Micro Irrigation Works Talwandi Ditry (RD 43060-50000) 2.43L 2023-24 (2604012044/IC/109142) |
On Going |
Work Deptt. |
Micro Irrigation Works |
2.30088 |
0.1212 |
0 |
0.01 |
0 |
2.43 |
2.28421 |
0.02727 |
0 |
0.01 |
0 |
2.32148 |
3 |
Rural Connectivity Talwandi rai 2023-24 convergance (2604012044/RC/9989104298) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.4 |
0.06 |
0.14 |
1.1 |
0 |
1.7 |
0.26664 |
0.05151 |
0.1005 |
0 |
0 |
0.41865 |
|
Grand Total |
|
|
|
10.9 |
0.28 |
0.14 |
1.12 |
0 |
12.44 |
4.77 |
0.08 |
0.1 |
0.02 |
0 |
4.97 |