S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Playground-Bhambotar (2607003018/AV/9989039009) |
On Going |
Gram Panchayat |
Anganwadi/Other Rural Infrastructure |
3.86971 |
0 |
0 |
1.44139 |
0 |
5.31 |
3.81741 |
0 |
0 |
0 |
0 |
3.81741 |
2 |
Retaining Wall (Bhambotar (2607003018/FP/9989037033) |
On Going |
Gram Panchayat |
Flood Control and Protection |
0.81515 |
0 |
0.11632 |
1.3 |
0 |
2.23 |
0.81204 |
0 |
0 |
0 |
0 |
0.81204 |
3 |
Rural Connectivity (Bhambotar (2607003018/RC/9989095271) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.32586 |
0 |
0 |
1.33219 |
0 |
1.66 |
0.31512 |
0 |
0 |
0 |
0 |
0.31512 |
4 |
Rural Connectivity (Bhambotar) (2607003018/RC/9989101840) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.45249 |
0.10758 |
0 |
0 |
0 |
0.56 |
0.45147 |
0 |
0 |
0 |
0 |
0.45147 |
5 |
solid waste management (2607003018/RS/9989030104) |
On Going |
Gram Panchayat |
Rural Sanitation |
0.76828 |
0 |
0 |
2.14417 |
0 |
2.91 |
0.76053 |
0 |
0 |
0 |
0 |
0.76053 |
|
Grand Total |
|
|
|
6.23 |
0.11 |
0.12 |
6.22 |
0 |
12.67 |
6.16 |
0 |
0 |
0 |
0 |
6.16 |