S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
एनीकट निर्माण कार्य सुराही दाई नाला में (1708001035/WC/22012035110041) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
0.5562493 |
0 |
0.0167268 |
3.3380684 |
0 |
3.91 |
0.5525 |
0 |
0 |
0 |
0 |
0.5525 |
2 |
एनीकट निर्माण कार्य पिटूआ नाला में (1708001035/WC/22012035110043) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
0.5574294 |
0 |
0.0167268 |
3.3382218 |
0 |
3.91 |
0.55668 |
0 |
0 |
0 |
0 |
0.55668 |
3 |
खखरी निर्माण कार्य कीरतपुर संपर्क मार्ग किशोरा पांडे से दुर्जन के खेत की ओर (1708001035/WC/22012035110045) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
8.027159 |
0.269136 |
0.0065856 |
4.7316855 |
0 |
13.03 |
0.64996 |
0 |
0 |
0 |
0 |
0.64996 |
|
Grand Total |
|
|
|
9.14 |
0.27 |
0.04 |
11.41 |
0 |
20.85 |
1.76 |
0 |
0 |
0 |
0 |
1.76 |