S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
strom water drainage system manmohan singh ke ghar se toran dwar tak (1715002112/FP/22012034630975) |
On Going |
GP-RD Deptt |
Flood Control and Protection |
1.8411664 |
0.0965089 |
0.3096884 |
11.001749 |
0 |
13.25 |
1.79203 |
0 |
0 |
9.07239 |
0 |
10.86442 |
2 |
Construction of PMAY-G House for Individuals -PMAY-G REG. NO. MP121614125 (1715002112/IF/IAY/4081486) |
On Going |
GP-RD Deptt |
Works on Individuals Land (Category IV) |
0.1938 |
0 |
0 |
0 |
0 |
0.19 |
0.14297 |
0 |
0 |
0 |
0 |
0.14297 |
3 |
strome water drainage system toran dwar se vishaidha nala tak (1715002112/WC/22012035000715) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
1.3430011 |
0.0760325 |
0.2336064 |
8.4774687 |
0 |
10.13 |
0.56559 |
0 |
0 |
8.31214 |
0 |
8.87773 |
|
Grand Total |
|
|
|
3.38 |
0.17 |
0.54 |
19.48 |
0 |
23.57 |
2.5 |
0 |
0 |
17.38 |
0 |
19.89 |