S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
RWH Rain water Harvesting (Anganwadi) GP Sawangi Asola 2022-2023 (1827011028/WC/GIS/16089) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
0.2647935 |
0.3589371 |
0.1367974 |
1.2284726 |
0 |
1.99 |
0 |
0 |
0 |
0 |
0 |
0 |
2 |
RWH Rain water Harvesting (ZP School) GP Sawangi Asola 2022-2023 (1827011028/WC/GIS/16090) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
0.3952933 |
0.5901032 |
0.3282353 |
1.5863676 |
0 |
2.9 |
0 |
0 |
0 |
0 |
0 |
0 |
3 |
JSV Sinchan Vihir (Yadavrao Dadaji Adkine) GP Sawangi Asola FY 2022-2023 (1827011028/IF/GIS/15896) |
On Going |
Gram Panchayat |
Works on Individuals Land (Category IV) |
2.2463577 |
0.0456677 |
0.047864 |
1.6601068 |
0 |
4 |
2.04687 |
0 |
0 |
0.92832 |
0 |
2.97519 |
4 |
RPB ( Road Side Plantation) GP Sawangi Asola FY 2022 - 23 (1827011028/DP/GIS/10612) |
On Going |
Gram Panchayat |
Drought Proofing |
5.4893568 |
0 |
0 |
1.034099 |
0.142976 |
6.67 |
0.40448 |
0 |
0 |
0 |
0 |
0.40448 |
|
Grand Total |
|
|
|
8.4 |
0.99 |
0.51 |
5.51 |
0.14 |
15.56 |
2.45 |
0 |
0 |
0.93 |
0 |
3.38 |