S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Estimate of work & Plantation DFO(Thana)2023-24 (2607005172/DP/139528) |
On Going |
Forest |
Drought Proofing |
12.1939 |
0 |
0 |
5.22594 |
0 |
17.42 |
0.33633 |
0 |
0 |
0 |
0 |
0.33633 |
2 |
Construction of Check Dam Downstream of Thana Dam Near Manhota(Thana)2023-24 (2607005172/FP/9989037104) |
On Going |
W.R Deptt. |
Flood Control and Protection |
0.73841 |
0 |
0 |
0.095 |
0 |
0.83 |
0 |
0 |
0 |
0 |
0 |
0 |
3 |
Rural Connectivity-1 (Thana)2023-24 (2607005172/RC/9989097497) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.96426 |
0 |
0 |
4.86159 |
0 |
5.83 |
0.96354 |
0 |
0 |
0 |
0 |
0.96354 |
4 |
Rural Connectivity-2(Thana)2023-24 (2607005172/RC/9989097683) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.96426 |
0 |
0 |
4.86159 |
0 |
5.83 |
0.96354 |
0 |
0 |
0 |
0 |
0.96354 |
5 |
Solid Base Managment(Thana)2023-24 (2607005172/RS/9989030457) |
On Going |
Gram Panchayat |
Rural Sanitation |
0.85 |
0 |
0 |
0 |
0 |
0.85 |
0.59388 |
0 |
0 |
0 |
0 |
0.59388 |
|
Grand Total |
|
|
|
15.71 |
0 |
0 |
15.04 |
0 |
30.76 |
2.86 |
0 |
0 |
0 |
0 |
2.86 |