S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
2nd year Maintenance Cashew Graft Plantation (3rd Year) of Ekamba (Area 10 Ha.) (2430/DP/10567533) |
On Going |
Horticulture Deptt. |
Water Conservation and Water Harvesting |
3.441 |
0 |
0 |
0.453 |
0 |
3.89 |
0.52614 |
0 |
0 |
0 |
0 |
0.52614 |
2 |
Construction of main gate with beutification at Ekamba 5t high school (2430004/AV/10502610) |
On Going |
Panchayat Samiti/PS/Block |
Anganwadi/Other Rural Infrastructure |
1.5231549 |
0.6841014 |
0 |
7.1740943 |
0.156 |
9.54 |
1.1433 |
0 |
0 |
0 |
0 |
1.1433 |
3 |
CONST. OF RURAL PARK AT EKAMBA NEAR SIVA TEMPLE JOGISAHI PHASE-1 (2430004/AV/10505488) |
On Going |
Panchayat Samiti/PS/Block |
Anganwadi/Other Rural Infrastructure |
3.7256961 |
1.1674126 |
0 |
4.894629 |
0.21225 |
10 |
3.0549 |
0 |
0 |
0 |
0 |
3.0549 |
4 |
Construction of cc Road and cc drain at 5t high school at Ekamba-B Reach-1 (2430004/RC/10551274) |
On Going |
Panchayat Samiti/PS/Block |
Rural Connectivity |
2.2248239 |
0.4680494 |
0 |
6.7186651 |
0 |
9.41 |
2.03124 |
0 |
0 |
0 |
0 |
2.03124 |
5 |
Construction of cc Road and cc Drain at 5t high school at Ekamba -B Reach-2 (2430004/RC/10551276) |
On Going |
Panchayat Samiti/PS/Block |
Rural Connectivity |
2.2347507 |
0.4644518 |
0 |
6.5800877 |
0.144 |
9.42 |
2.133 |
0 |
0 |
0 |
0 |
2.133 |
6 |
Road side Earthen Drain at Nuasahi to Jamjhola Road (2430004/WC/10574640) |
On Going |
Panchayat Samiti/PS/Block |
Water Conservation and Water Harvesting |
4.455462 |
0 |
0 |
0.4195055 |
0.125 |
5 |
4.32234 |
0 |
0 |
0 |
0 |
4.32234 |
7 |
Road side Earthe Drain at Rangmatiguda School to Dhepguda (2430004/WC/10574642) |
On Going |
Panchayat Samiti/PS/Block |
Water Conservation and Water Harvesting |
4.455462 |
0 |
0 |
0.4195055 |
0.125 |
5 |
4.3734 |
0 |
0 |
0 |
0 |
4.3734 |
8 |
Staggered strench at Manjurnacha forest (2430004/WC/10574648) |
On Going |
Panchayat Samiti/PS/Block |
Water Conservation and Water Harvesting |
4.6683862 |
0 |
0 |
0.2216743 |
0.10991 |
5 |
4.55988 |
0 |
0 |
0 |
0 |
4.55988 |
9 |
Stagged trench at Makadkendu Forest (2430004/WC/10574653) |
On Going |
Panchayat Samiti/PS/Block |
Water Conservation and Water Harvesting |
4.6683862 |
0 |
0 |
0.2216743 |
0.10991 |
5 |
4.60206 |
0 |
0 |
0 |
0 |
4.60206 |
10 |
Imp of Road from Jamjhola Saidongari Road (2430004013/RC/10540068) |
On Going |
Gram Panchayat |
Rural Connectivity |
4.6289905 |
0 |
0 |
0.2539804 |
0.117 |
5 |
3.49184 |
0 |
0 |
0 |
0 |
3.49184 |
11 |
stagger trench at ekamba foresst jharbandhuguda side reach 1 (2430004013/WC/10527961) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
1.8572242 |
0 |
0 |
0.0985684 |
0.0442 |
2 |
1.7538 |
0 |
0 |
0 |
0 |
1.7538 |
12 |
Stagged strench at Rangmatiguda Anchala Forest 3 (2430004013/WC/10538530) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
4.220964 |
0 |
0 |
0.647201 |
0.13181 |
5 |
4.89278 |
0 |
0 |
0 |
0 |
4.89278 |
13 |
Multi Purpose farm pond of Sri Sanu Santa Jharbandhguda (2430004013/WC/10538531) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
3.0271055 |
0 |
0 |
0.1428749 |
0 |
3.17 |
3.01344 |
0 |
0 |
0 |
0 |
3.01344 |
14 |
Stagged trench at Dhanpur Forest (2430004013/WC/10574700) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
4.6683862 |
0 |
0 |
0.2216743 |
0.10991 |
5 |
4.662 |
0 |
0 |
0 |
0 |
4.662 |
15 |
Road side trench at Rangmatiguda Masanipada Road (2430004013/WC/10574713) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
4.6683862 |
0 |
0 |
0.2216743 |
0.10991 |
5 |
4.2291 |
0 |
0 |
0.2 |
0 |
4.4291 |
|
Grand Total |
|
|
|
54.47 |
2.78 |
0 |
28.69 |
1.49 |
87.43 |
48.79 |
0 |
0 |
0.2 |
0 |
48.99 |