S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Roof top water harvwsting structure high school khedi khurd (1724007017/WC/22012034757260) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
0.0574653 |
0.0243445 |
0.0221227 |
0.3502235 |
0 |
0.45 |
0.0486 |
0 |
0 |
0 |
0 |
0.0486 |
2 |
boulder check dam thibgaw road dongergaw (1724007017/WC/22012035203442) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
1.1975001 |
0.0772696 |
0.0009321 |
0.2197418 |
0 |
1.5 |
1.10565 |
0 |
0 |
0 |
0 |
1.10565 |
3 |
C P T miyawaki ke pass khedi khurd (1724007017/WC/22012035209434) |
On Going |
GP-RD Deptt |
Water Conservation and Water Harvesting |
0.8018882 |
0.0031816 |
0.0156048 |
0.1337575 |
0 |
0.95 |
0.36936 |
0 |
0 |
0 |
0 |
0.36936 |
|
Grand Total |
|
|
|
2.06 |
0.1 |
0.04 |
0.7 |
0 |
2.9 |
1.52 |
0 |
0 |
0 |
0 |
1.52 |