S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
आर डी एफ प्रथम व़क्षारोपण बिदियाद का पुनरोध्दार बिदियाद (2714010336/DP/112908420213) |
On Going |
Forest |
Drought Proofing |
8.29 |
0.49 |
0 |
0.1 |
0 |
8.88 |
7.81675 |
0.13865 |
0.1034 |
0 |
0 |
8.0588 |
2 |
ग्रेवल सड़क निर्माण मेघवालो की खेली से सरजू की ढाणी किशोरपुरा (2714010336/RC/112908346549) |
On Going |
Gram Panchayat |
Rural Connectivity |
5.4877439 |
0.25615 |
0 |
3.4105217 |
0.18 |
9.33 |
4.59873 |
0.2021 |
0 |
0 |
0 |
4.80083 |
3 |
WBM SADAK NIRMAN KARY CHHABOLAI NADI SE TEEJABAI KI DHANI KM. 0/0 SE 1/500 BIDIYAD (2714010336/RC/112908401916) |
On Going |
Work Deptt. |
Rural Connectivity |
19.61 |
3 |
0 |
10.18 |
0 |
32.79 |
18.45703 |
0.4152 |
0.0533 |
0 |
0 |
18.92553 |
4 |
ग्रेवल सडक निर्माण आर के बोर्ड से सिंचाई बांध खिदरपुरा सीमा तक बिदियाद 2 km (2714010336/RC/112908456294) |
On Going |
Gram Panchayat |
Rural Connectivity |
14.6472705 |
0.4888 |
0.5652277 |
11.8126581 |
0 |
27.51 |
6.68579 |
0.1363 |
0.05405 |
0 |
0 |
6.87614 |
5 |
MODEL TALAB NATHOLAI NADI KHUDAI KARY V VISTAR AVM PITCHING KARY BIDIYAD (2714010336/WC/112908363600) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
18.1432891 |
0.5029 |
0 |
3.055475 |
0 |
21.7 |
0 |
0 |
0 |
0 |
0 |
0 |
|
Grand Total |
|
|
|
66.18 |
4.74 |
0.57 |
28.56 |
0.18 |
100.21 |
37.56 |
0.89 |
0.21 |
0 |
0 |
38.66 |