S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Construction of Cremation ground (2603008007/AV/9989037584) |
On Going |
R.D.Deptt. |
Anganwadi/Other Rural Infrastructure |
1 |
0 |
0.5 |
6.3 |
0 |
7.8 |
0.2964 |
0 |
0 |
0 |
0 |
0.2964 |
2 |
Interlock Street Devi Dass to Kewal House ( Balluana) (2603008007/RC/9989037677) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.6407491 |
0.1165094 |
0.2150765 |
3.5946192 |
0 |
4.57 |
0.29719 |
0.05148 |
0.19848 |
3.11888 |
0 |
3.66603 |
3 |
Interlock Street and Drain Om Parkash to Nanak House ( Balluana) (2603008007/RC/9989037678) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.5413463 |
0.1080205 |
0.2439946 |
3.2429372 |
0 |
4.14 |
0.2893 |
0.10296 |
0.19662 |
2.2295 |
0 |
2.81838 |
4 |
Kharwanja in ( Balluana) (2603008007/RC/9989061261) |
On Going |
Gram Panchayat |
Rural Connectivity |
0.6219602 |
0.5989247 |
0 |
8.7434888 |
0 |
9.96 |
0.3432 |
0 |
0 |
0 |
0 |
0.3432 |
5 |
Construction of interlock road (2603008/RC/9989065872) |
On Going |
R.D.Deptt. |
Rural Connectivity |
2 |
1.5 |
1.5 |
20.76 |
0 |
25.76 |
1.1818 |
0 |
0 |
0 |
0 |
1.1818 |
|
Grand Total |
|
|
|
4.8 |
2.32 |
2.46 |
42.64 |
0 |
52.23 |
2.41 |
0.15 |
0.4 |
5.35 |
0 |
8.31 |