S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Tree plantation at Lawairam sorbung (2008003030/DP/34924) |
On Going |
Gram Panchayat |
Drought Proofing |
8.2888578 |
0 |
0 |
4.2760098 |
0 |
12.56 |
8.23105 |
0 |
0 |
2.428 |
0 |
10.65905 |
2 |
Tree Plantation at Sorbung (2008003030/DP/37491) |
On Going |
Gram Panchayat |
Drought Proofing |
8.6362878 |
0 |
0 |
2.6723623 |
0.09085 |
11.4 |
8.268 |
0 |
0 |
0 |
0 |
8.268 |
3 |
Construction of retaining wall at new playground (2008003030/FP/45537) |
On Going |
Gram Panchayat |
Flood Control and Protection |
2.1096156 |
2.3919379 |
0 |
15.3455912 |
0.1372 |
19.98 |
0.0026 |
0 |
0 |
0 |
0 |
0.0026 |
4 |
VILLAGE CIRCULAR ROAD (SORBUNG) (2008003030/RC/44101) |
On Going |
Gram Panchayat |
Rural Connectivity |
12.6776308 |
0.748927 |
0 |
5.381146 |
0 |
18.81 |
0.0026 |
0 |
0 |
5.36 |
0 |
5.3626 |
5 |
IVRfrom village to Maklang river (2008003030/RC/47914) |
On Going |
Gram Panchayat |
Rural Connectivity |
18.25518 |
0 |
0 |
0.6609073 |
0 |
18.92 |
18.1788 |
0 |
0 |
0 |
0 |
18.1788 |
6 |
IVR new cutting new cutting from Sorbung to Maklang river (2008003030/RC/50278) |
On Going |
Gram Panchayat |
Rural Connectivity |
6.2406897 |
0 |
0 |
4.1745126 |
0.10015 |
10.52 |
3.2578 |
0 |
0 |
2.04998 |
0 |
5.30778 |
7 |
Water Tank (Sorbung1) (2008003030/WC/36702) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
1.0779175 |
0.5363575 |
0.0101347 |
7.3075324 |
0.21715 |
9.15 |
0.0026 |
0 |
0 |
7.2061 |
0 |
7.2087 |
|
Grand Total |
|
|
|
57.29 |
3.68 |
0.01 |
39.82 |
0.55 |
101.34 |
37.94 |
0 |
0 |
17.04 |
0 |
54.99 |