S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
CONST OF PUCCA SIDE DRAIN AT M SONGGEL (2003009055/FP/44256) |
On Going |
Gram Panchayat |
Flood Control and Protection |
2.0163823 |
1.005998 |
0.021735 |
15.5814182 |
0.1604 |
18.79 |
1.11193 |
0 |
0 |
5.9686 |
0 |
7.08053 |
2 |
Fishery pond at M. Songgel (2003009055/FR/1945) |
On Going |
Gram Panchayat |
Fisheries |
9.8636808 |
0.128064 |
0 |
0.1872483 |
0 |
10.18 |
1.43 |
0 |
0 |
0 |
0 |
1.43 |
3 |
Impvt of road with shingling (2Nos) at M. Songgel (2003009055/RC/47529) |
On Going |
Gram Panchayat |
Rural Connectivity |
12.850338 |
0 |
0 |
3.728203 |
0.01948 |
16.6 |
10.0802 |
0 |
0 |
0 |
0 |
10.0802 |
4 |
DEEPENING AND RENOVATION AT M SONGGEL STREAM (2003009055/WC/48801) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
5.5437213 |
0 |
0 |
0.1358795 |
0 |
5.68 |
5.09607 |
0 |
0 |
0 |
0 |
5.09607 |
|
Grand Total |
|
|
|
30.27 |
1.13 |
0.02 |
19.63 |
0.18 |
51.25 |
17.72 |
0 |
0 |
5.97 |
0 |
23.69 |