S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
अमृत वाटिका( वसुधा बंधन )निर्माण कार्य प्राइमरी स्कूल सौराहा टोला (1746003006/DP/22012034601763) |
On Going |
GP-RD Deptt |
Drought Proofing |
0.2792466 |
0 |
0 |
0.2792274 |
0 |
0.56 |
0.0352 |
0 |
0 |
0 |
0 |
0.0352 |
2 |
पी।सी सी आंतरिक मार्ग निर्माण कार्य केशव सिंह के घर से सेजराम के घर की ओर (1746003006/RC/22012034667839) |
On Going |
GP-RD Deptt |
Rural Connectivity |
0.6 |
0 |
0 |
0 |
0 |
0.6 |
0.00209 |
0 |
0 |
0 |
0 |
0.00209 |
3 |
kapildhara koop nirman kary rohni patel/rambahor patel (1746003006/IF/22012035075314) |
On Going |
GP-RD Deptt |
Works on Individuals Land (Category IV) |
0.6556262 |
0.010079 |
0.025147 |
1.0644974 |
0 |
1.76 |
0.0084 |
0 |
0 |
0 |
0 |
0.0084 |
4 |
kapildhara koop nirman kary lalan pav /ramesh pav (1746003006/IF/22012035075313) |
On Going |
GP-RD Deptt |
Works on Individuals Land (Category IV) |
0.6557809 |
0.010079 |
0.025424 |
1.1193227 |
0.035 |
1.85 |
0.0084 |
0 |
0 |
0 |
0 |
0.0084 |
5 |
Khet talab nirman kary Pushpendra patel (1746003006/IF/22012035111455) |
On Going |
GP-RD Deptt |
Works on Individuals Land (Category IV) |
2.927386 |
0.0018679 |
0.0005796 |
0.4031033 |
0 |
3.33 |
0.7196 |
0 |
0 |
0 |
0 |
0.7196 |
6 |
khet talab nirman kary shyam bai baiga (1746003006/IF/22012035075310) |
On Going |
GP-RD Deptt |
Works on Individuals Land (Category IV) |
2.9931328 |
0.0018679 |
0.0005796 |
0.4116101 |
0 |
3.41 |
2.81733 |
0 |
0 |
0 |
0 |
2.81733 |
7 |
Segregation shed niirman kary Barbaspur (1746003006/RS/22012034689614) |
On Going |
GP-RD Deptt |
Rural Sanitation |
0.6522487 |
0.2312073 |
0.3223699 |
5.7251972 |
0.035 |
6.97 |
0.54012 |
0 |
0 |
0 |
0 |
0.54012 |
8 |
Boundry wall nirman kary anganvadi barbaspur (1746003006/AV/22012034633200) |
On Going |
GP-RD Deptt |
Anganwadi/Other Rural Infrastructure |
1.3030276 |
0.5032792 |
0.2963748 |
7.9825804 |
0.085 |
10.17 |
1.28916 |
0 |
0 |
0 |
0 |
1.28916 |
|
Grand Total |
|
|
|
10.07 |
0.76 |
0.67 |
16.99 |
0.16 |
28.65 |
5.42 |
0 |
0 |
0 |
0 |
5.42 |