S No. |
Work Name(Work Code) |
Work Status |
Agency Category |
Work Category |
Estimated Cost(in lakhs) |
Expenditure On: |
Labour |
Material |
Contingency |
Total |
Labour |
Material |
Contingency |
Total |
Unskilled |
Semi-Skilled |
Skilled |
Unskilled |
Semi-Skilled |
Skilled |
1 |
Const. Of Farm Pond Gopinath Dehury (2407005/IF/10932583) |
On Going |
Soil Conservation Deptt |
Works on Individuals Land (Category IV) |
1.7813 |
0 |
0 |
0.2187 |
0 |
2 |
0.01422 |
0 |
0 |
0 |
0 |
0.01422 |
2 |
Const. of Farm Pond of Biranchi Sahoo (2407005/IF/10972869) |
On Going |
Soil Conservation Deptt |
Works on Individuals Land (Category IV) |
1.68942 |
0 |
0 |
0.21733 |
0 |
1.91 |
1.32246 |
0 |
0 |
0 |
0 |
1.32246 |
3 |
Const. of Farm Pond of Gouranga Sahoo (2407005/IF/11106398) |
On Going |
Soil Conservation Deptt |
Works on Individuals Land (Category IV) |
1.72894 |
0 |
0 |
0.17866 |
0 |
1.91 |
0.01422 |
0 |
0 |
0 |
0 |
0.01422 |
4 |
CONSTRUCTION OF BOUNDARY WALL AT- CHANDAPUR HIGHSCHOOL"UNDER 5T" (2407005006/AV/10487013) |
On Going |
Gram Panchayat |
Anganwadi/Other Rural Infrastructure |
0.9942945 |
0.9264187 |
0 |
5.1876812 |
0.1 |
7.21 |
0.96792 |
0 |
0 |
0 |
0 |
0.96792 |
5 |
Formation Of RD Road To Udalapasi Road At- Chandapur (2407005006/RC/10538639) |
On Going |
Gram Panchayat |
Rural Connectivity |
2.9906476 |
0 |
0 |
0.9093413 |
0.1 |
4 |
2.18765 |
0 |
0 |
0 |
0 |
2.18765 |
6 |
CONST. OF HUNDALADHARA PAKAT TO CHARADANALI WATERABSORPTION TRENCH , AT -TIPEIJHARAN. (2407005006/WC/10492948) |
On Going |
Gram Panchayat |
Water Conservation and Water Harvesting |
4.774645 |
0 |
0 |
0.1819855 |
0.0433695 |
5 |
2.37156 |
0 |
0 |
0 |
0 |
2.37156 |
7 |
Construction Of Nigamanand Tank Under Amrit Sarovar. (2407005006/WH/10497684) |
On Going |
Gram Panchayat |
Renovation of traditional water bodies |
9.077797 |
0 |
0 |
0.322177 |
0.1 |
9.5 |
8.93886 |
0 |
0 |
0 |
0 |
8.93886 |
|
Grand Total |
|
|
|
23.04 |
0.93 |
0 |
7.22 |
0.34 |
31.53 |
15.82 |
0 |
0 |
0 |
0 |
15.82 |