S No. |
District |
Block |
GP |
Implementing Agency |
Project Name with code |
E-MR No. |
DateFrom--DateTo |
1 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr Revetment(Gabian Structure)Upstream Stud of RD79288 of 1-R Band Along at TAJOWAL (2614005093/FP/9989038058) |
14 |
02/04/2024--12/04/2024 |
2 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr Revetment(Gabian Structure)Upstream Stud of RD79288 of 1-R Band Along at TAJOWAL (2614005093/FP/9989038058) |
16 |
02/04/2024--12/04/2024 |
3 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr Revetment(Gabian Structure)Upstream Stud of RD79288 of 1-R Band Along at TAJOWAL (2614005093/FP/9989038058) |
17 |
02/04/2024--12/04/2024 |
4 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr Revetment(Gabian Structure)Upstream Stud of RD79288 of 1-R Band Along at TAJOWAL (2614005093/FP/9989038058) |
18 |
02/04/2024--12/04/2024 |
5 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr Revetment(Gabian Structure)Upstream Stud of RD79288 of 1-R Band Along at TAJOWAL (2614005093/FP/9989038058) |
19 |
02/04/2024--12/04/2024 |
6 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr Revetment(Gabian Structure)Upstream Stud of RD79288 of 1-R Band Along at TAJOWAL (2614005093/FP/9989038058) |
22 |
02/04/2024--12/04/2024 |
7 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of rd 79400of1RBAND river sutlej save Abadies VillTajowal (2614005093/FP/9989038048) |
89 |
04/04/2024--12/04/2024 |
8 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of rd 79400of1RBAND river sutlej save Abadies VillTajowal (2614005093/FP/9989038048) |
90 |
04/04/2024--12/04/2024 |
9 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of rd 79400of1RBAND river sutlej save Abadies VillTajowal (2614005093/FP/9989038048) |
91 |
04/04/2024--12/04/2024 |
10 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of rd 79288of1RBANDriver sutlej to vill TAJOWAL (2614005093/FP/9989038052) |
92 |
04/04/2024--12/04/2024 |
11 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of rd 79288of1RBANDriver sutlej to vill TAJOWAL (2614005093/FP/9989038052) |
93 |
04/04/2024--12/04/2024 |
12 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of79076 rd of1RBANDriver sutlej to vill Tajowal (2614005093/FP/9989038053) |
94 |
04/04/2024--12/04/2024 |
13 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of79076 rd of1RBANDriver sutlej to vill Tajowal (2614005093/FP/9989038053) |
95 |
04/04/2024--12/04/2024 |
14 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of rd 78864of1RBANDriver sutlej to vill Tajowal (2614005093/FP/9989038054) |
96 |
04/04/2024--12/04/2024 |
15 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of rd 78864of1RBANDriver sutlej to vill Tajowal (2614005093/FP/9989038054) |
97 |
04/04/2024--12/04/2024 |
16 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of rd78864 of1RBANDriver sutlej to vill Tajowal (2614005093/FP/9989038055) |
98 |
04/04/2024--12/04/2024 |
17 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of rd78864 of1RBANDriver sutlej to vill Tajowal (2614005093/FP/9989038055) |
99 |
04/04/2024--12/04/2024 |
18 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of rd 79288of1RBANDriver sutlej to vill TAJOWAL (2614005093/FP/9989038052) |
108 |
04/04/2024--12/04/2024 |
19 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of79076 rd of1RBANDriver sutlej to vill Tajowal (2614005093/FP/9989038053) |
109 |
04/04/2024--12/04/2024 |
20 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
112 |
06/04/2024--10/04/2024 |
21 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
113 |
06/04/2024--10/04/2024 |
22 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
114 |
06/04/2024--10/04/2024 |
23 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
115 |
06/04/2024--10/04/2024 |
24 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
156 |
11/04/2024--12/04/2024 |
25 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
157 |
11/04/2024--12/04/2024 |
26 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
158 |
11/04/2024--12/04/2024 |
27 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
159 |
11/04/2024--12/04/2024 |
28 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for ConstRevetment(Gabian Structure) Upstream Stud of RD79500 of 1-RBand Along at vill Tajowal (2614005093/FP/9989038056) |
203 |
15/04/2024--23/04/2024 |
29 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for ConstRevetment(Gabian Structure) Upstream Stud of RD79500 of 1-RBand Along at vill Tajowal (2614005093/FP/9989038056) |
204 |
15/04/2024--23/04/2024 |
30 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for ConstRevetment(Gabian Structure) Upstream Stud of RD79500 of 1-RBand Along at vill Tajowal (2614005093/FP/9989038056) |
205 |
15/04/2024--23/04/2024 |
31 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for ConstRevetment(Gabian Structure) Upstream Stud of RD79500 of 1-RBand Along at vill Tajowal (2614005093/FP/9989038056) |
206 |
15/04/2024--23/04/2024 |
32 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Const Revetment(Gabian Structure)Upstream spur of RD79500of 1-R Band Along vill tajowal (2614005093/FP/9989038057) |
207 |
15/04/2024--23/04/2024 |
33 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Const Revetment(Gabian Structure)Upstream spur of RD79500of 1-R Band Along vill tajowal (2614005093/FP/9989038057) |
208 |
15/04/2024--23/04/2024 |
34 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Const Revetment(Gabian Structure)Upstream spur of RD79500of 1-R Band Along vill tajowal (2614005093/FP/9989038057) |
209 |
15/04/2024--23/04/2024 |
35 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Const Revetment(Gabian Structure)Upstream spur of RD79500of 1-R Band Along vill tajowal (2614005093/FP/9989038057) |
210 |
15/04/2024--23/04/2024 |
36 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Const Revetment(Gabian Structure)Upstream spur of RD79500of 1-R Band Along vill tajowal (2614005093/FP/9989038057) |
211 |
15/04/2024--23/04/2024 |
37 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estima for Constr Revetment(Gabian Structure)Upstream Stud of RD 79076 of 1-R BandAlong Vill TAJOWAL (2614005093/FP/9989038059) |
212 |
15/04/2024--23/04/2024 |
38 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estima for Constr Revetment(Gabian Structure)Upstream Stud of RD 79076 of 1-R BandAlong Vill TAJOWAL (2614005093/FP/9989038059) |
213 |
15/04/2024--23/04/2024 |
39 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estima for Constr Revetment(Gabian Structure)Upstream Stud of RD 79076 of 1-R BandAlong Vill TAJOWAL (2614005093/FP/9989038059) |
214 |
15/04/2024--23/04/2024 |
40 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estima for Constr Revetment(Gabian Structure)Upstream Stud of RD 79076 of 1-R BandAlong Vill TAJOWAL (2614005093/FP/9989038059) |
215 |
15/04/2024--23/04/2024 |
41 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estima for Constr Revetment(Gabian Structure)Upstream Stud of RD 79076 of 1-R BandAlong Vill TAJOWAL (2614005093/FP/9989038059) |
216 |
15/04/2024--23/04/2024 |
42 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estima for Constr Revetment(Gabian Structure)Upstream Stud of RD 79076 of 1-R BandAlong Vill TAJOWAL (2614005093/FP/9989038059) |
217 |
15/04/2024--23/04/2024 |
43 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estima for Constr Revetment(Gabian Structure)Upstream Stud of RD 79076 of 1-R BandAlong Vill TAJOWAL (2614005093/FP/9989038059) |
218 |
15/04/2024--23/04/2024 |
44 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr Revetment(Gabian Structure)Upstream Stud of RD79288 of 1-R Band Along at TAJOWAL (2614005093/FP/9989038058) |
219 |
15/04/2024--23/04/2024 |
45 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr Revetment(Gabian Structure)Upstream Stud of RD79288 of 1-R Band Along at TAJOWAL (2614005093/FP/9989038058) |
220 |
15/04/2024--23/04/2024 |
46 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
348 |
25/04/2024--03/05/2024 |
47 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
349 |
25/04/2024--03/05/2024 |
48 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
350 |
25/04/2024--03/05/2024 |
49 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
351 |
25/04/2024--03/05/2024 |
50 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
352 |
25/04/2024--03/05/2024 |
51 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
353 |
25/04/2024--03/05/2024 |
52 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
354 |
25/04/2024--03/05/2024 |
53 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
355 |
25/04/2024--03/05/2024 |
54 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for ConstRevetment(Gabian Structure) Upstream Stud of RD79500 of 1-RBand Along at vill Tajowal (2614005093/FP/9989038056) |
567 |
06/05/2024--14/05/2024 |
55 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of rd78864 of1RBANDriver sutlej to vill Tajowal (2614005093/FP/9989038055) |
568 |
06/05/2024--14/05/2024 |
56 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of rd78864 of1RBANDriver sutlej to vill Tajowal (2614005093/FP/9989038055) |
569 |
06/05/2024--14/05/2024 |
57 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of rd 78864of1RBANDriver sutlej to vill Tajowal (2614005093/FP/9989038054) |
570 |
06/05/2024--14/05/2024 |
58 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr. stud(Gabbainstructure)of rd 78864of1RBANDriver sutlej to vill Tajowal (2614005093/FP/9989038054) |
571 |
06/05/2024--14/05/2024 |
59 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr Revetment(Gabian Structure)Upstream Stud of RD79288 of 1-R Band Along at TAJOWAL (2614005093/FP/9989038058) |
572 |
06/05/2024--14/05/2024 |
60 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr Revetment(Gabian Structure)Upstream Stud of RD79288 of 1-R Band Along at TAJOWAL (2614005093/FP/9989038058) |
573 |
06/05/2024--14/05/2024 |
61 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr Revetment(Gabian Structure)Upstream Stud of RD79288 of 1-R Band Along at TAJOWAL (2614005093/FP/9989038058) |
574 |
06/05/2024--14/05/2024 |
62 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr Revetment(Gabian Structure)Upstream Stud of RD79288 of 1-R Band Along at TAJOWAL (2614005093/FP/9989038058) |
575 |
06/05/2024--14/05/2024 |
63 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Constr Revetment(Gabian Structure)Upstream Stud of RD79288 of 1-R Band Along at TAJOWAL (2614005093/FP/9989038058) |
593 |
06/05/2024--14/05/2024 |
64 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
791 |
16/05/2024--24/05/2024 |
65 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
792 |
16/05/2024--24/05/2024 |
66 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
793 |
16/05/2024--24/05/2024 |
67 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
794 |
16/05/2024--24/05/2024 |
68 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estima for Constr Revetment(Gabian Structure)Upstream Stud of RD 79076 of 1-R BandAlong Vill TAJOWAL (2614005093/FP/9989038059) |
800 |
16/05/2024--25/05/2024 |
69 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estima for Constr Revetment(Gabian Structure)Upstream Stud of RD 79076 of 1-R BandAlong Vill TAJOWAL (2614005093/FP/9989038059) |
801 |
16/05/2024--25/05/2024 |
70 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estima for Constr Revetment(Gabian Structure)Upstream Stud of RD 79076 of 1-R BandAlong Vill TAJOWAL (2614005093/FP/9989038059) |
802 |
16/05/2024--25/05/2024 |
71 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
803 |
16/05/2024--24/05/2024 |
72 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
804 |
16/05/2024--24/05/2024 |
73 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
805 |
16/05/2024--24/05/2024 |
74 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
806 |
16/05/2024--24/05/2024 |
75 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
807 |
16/05/2024--24/05/2024 |
76 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
828 |
16/05/2024--24/05/2024 |
77 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
829 |
16/05/2024--24/05/2024 |
78 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
952 |
27/05/2024--04/06/2024 |
79 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
953 |
27/05/2024--04/06/2024 |
80 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
954 |
27/05/2024--04/06/2024 |
81 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
955 |
27/05/2024--04/06/2024 |
82 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
956 |
27/05/2024--04/06/2024 |
83 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
957 |
27/05/2024--04/06/2024 |
84 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
958 |
27/05/2024--04/06/2024 |
85 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
1110 |
06/06/2024--15/06/2024 |
86 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
1111 |
06/06/2024--15/06/2024 |
87 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
1112 |
06/06/2024--15/06/2024 |
88 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
1113 |
06/06/2024--15/06/2024 |
89 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estim for Constru Revetment(GabianStructure) Upstream Stud of RD 78864 of 1-RBand Along at TAJOWAL (2614005093/FP/9989038060) |
1114 |
06/06/2024--15/06/2024 |
90 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estima for Constr Revetment(Gabian Structure)Upstream Stud of RD 79076 of 1-R BandAlong Vill TAJOWAL (2614005093/FP/9989038059) |
1115 |
06/06/2024--15/06/2024 |
91 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estima for Constr Revetment(Gabian Structure)Upstream Stud of RD 79076 of 1-R BandAlong Vill TAJOWAL (2614005093/FP/9989038059) |
1116 |
06/06/2024--15/06/2024 |
92 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Const Revetment(Gabian Structure)Upstream spur of RD79500of 1-R Band Along vill tajowal (2614005093/FP/9989038057) |
1117 |
06/06/2024--15/06/2024 |
93 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Land leveling & shaping of Bandh At Vill Tajowal (2614005093/LD/9989067546) |
1132 |
08/06/2024--16/06/2024 |
94 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Land leveling & shaping of Bandh At Vill Tajowal (2614005093/LD/9989067546) |
1133 |
08/06/2024--16/06/2024 |
95 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
1134 |
08/06/2024--16/06/2024 |
96 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
1135 |
08/06/2024--16/06/2024 |
97 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
1223 |
08/06/2024--16/06/2024 |
98 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
1224 |
08/06/2024--16/06/2024 |
99 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
1263 |
18/06/2024--26/06/2024 |
100 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
1264 |
18/06/2024--26/06/2024 |
101 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
1267 |
18/06/2024--26/06/2024 |
102 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
1268 |
18/06/2024--26/06/2024 |
103 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
Gram Panchayat (Gram Panchayat) |
Const.of Laying of Shila phalkam and 200 Plantation At Vill Tajowal (2614005093/DP/140961) |
1367 |
24/06/2024--03/07/2024 |
104 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
Gram Panchayat (Gram Panchayat) |
Const.of Laying of Shila phalkam and 200 Plantation At Vill Tajowal (2614005093/DP/140961) |
1368 |
24/06/2024--03/07/2024 |
105 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
Gram Panchayat (Gram Panchayat) |
Const.of Laying of Shila phalkam and 200 Plantation At Vill Tajowal (2614005093/DP/140961) |
1369 |
24/06/2024--03/07/2024 |
106 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
Gram Panchayat (Gram Panchayat) |
Const.of Laying of Shila phalkam and 200 Plantation At Vill Tajowal (2614005093/DP/140961) |
1370 |
24/06/2024--03/07/2024 |
107 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
Gram Panchayat (Gram Panchayat) |
Const.of Laying of Shila phalkam and 200 Plantation At Vill Tajowal (2614005093/DP/140961) |
1488 |
24/06/2024--03/07/2024 |
108 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
Gram Panchayat (Gram Panchayat) |
Const.of Laying of Shila phalkam and 200 Plantation At Vill Tajowal (2614005093/DP/140961) |
1677 |
06/07/2024--14/07/2024 |
109 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
Gram Panchayat (Gram Panchayat) |
Const.of Laying of Shila phalkam and 200 Plantation At Vill Tajowal (2614005093/DP/140961) |
1679 |
06/07/2024--14/07/2024 |
110 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
Gram Panchayat (Gram Panchayat) |
STRENGTH OF BERM SIDE SHOLDER FROM SCHOOL TO SATLUJ BANN AT VILL TAJOWAL (2614005093/LD/9989071905) |
1924 |
17/07/2024--26/07/2024 |
111 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
Gram Panchayat (Gram Panchayat) |
STRENGTH OF BERM SIDE SHOLDER FROM SCHOOL TO SATLUJ BANN AT VILL TAJOWAL (2614005093/LD/9989071905) |
1925 |
17/07/2024--26/07/2024 |
112 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
Gram Panchayat (Gram Panchayat) |
STRENGTH OF BERM SIDE SHOLDER FROM SCHOOL TO SATLUJ BANN AT VILL TAJOWAL (2614005093/LD/9989071905) |
1926 |
17/07/2024--26/07/2024 |
113 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
Gram Panchayat (Gram Panchayat) |
STRENGTH OF BERM SIDE SHOLDER FROM SCHOOL TO SATLUJ BANN AT VILL TAJOWAL (2614005093/LD/9989071905) |
1927 |
17/07/2024--26/07/2024 |
114 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2099 |
26/07/2024--04/08/2024 |
115 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2100 |
26/07/2024--04/08/2024 |
116 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2101 |
26/07/2024--04/08/2024 |
117 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2102 |
26/07/2024--04/08/2024 |
118 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2103 |
26/07/2024--04/08/2024 |
119 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2104 |
26/07/2024--04/08/2024 |
120 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2105 |
26/07/2024--04/08/2024 |
121 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2164 |
26/07/2024--04/08/2024 |
122 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2165 |
26/07/2024--04/08/2024 |
123 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2166 |
26/07/2024--04/08/2024 |
124 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2201 |
26/07/2024--04/08/2024 |
125 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80000 and 80150 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073694) |
2341 |
08/08/2024--11/08/2024 |
126 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80150 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073699) |
2342 |
08/08/2024--11/08/2024 |
127 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 79928 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073744) |
2343 |
08/08/2024--11/08/2024 |
128 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 79856 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073743) |
2345 |
08/08/2024--11/08/2024 |
129 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80000 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073741) |
2346 |
08/08/2024--11/08/2024 |
130 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80250 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073702) |
2347 |
08/08/2024--11/08/2024 |
131 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Plantation on Side Slope of Bandh Rd 75000 to 85000 at Vill TAJOWAL (2614005093/DP/150262) |
2435 |
13/08/2024--21/08/2024 |
132 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Plantation on Side Slope of Bandh Rd 75000 to 85000 at Vill TAJOWAL (2614005093/DP/150262) |
2436 |
13/08/2024--21/08/2024 |
133 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Plantation on Side Slope of Bandh Rd 75000 to 85000 at Vill TAJOWAL (2614005093/DP/150262) |
2437 |
13/08/2024--21/08/2024 |
134 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Plantation on Side Slope of Bandh Rd 75000 to 85000 at Vill TAJOWAL (2614005093/DP/150262) |
2438 |
13/08/2024--21/08/2024 |
135 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80000 and 80150 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073694) |
2443 |
12/08/2024--21/08/2024 |
136 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80250 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073702) |
2444 |
12/08/2024--21/08/2024 |
137 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 79856 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073743) |
2445 |
12/08/2024--21/08/2024 |
138 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80150 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073699) |
2446 |
12/08/2024--21/08/2024 |
139 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80000 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073741) |
2447 |
12/08/2024--21/08/2024 |
140 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 79928 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073744) |
2448 |
12/08/2024--21/08/2024 |
141 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Plantation on Side Slope of Bandh Rd 75000 to 85000 at Vill TAJOWAL (2614005093/DP/150262) |
2449 |
13/08/2024--21/08/2024 |
142 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Plantation on Side Slope of Bandh Rd 75000 to 85000 at Vill TAJOWAL (2614005093/DP/150262) |
2450 |
13/08/2024--21/08/2024 |
143 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Plantation on Side Slope of Bandh Rd 75000 to 85000 at Vill TAJOWAL (2614005093/DP/150262) |
2466 |
13/08/2024--21/08/2024 |
144 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80250 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073702) |
2477 |
12/08/2024--21/08/2024 |
145 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80250 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073702) |
2478 |
12/08/2024--21/08/2024 |
146 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2555 |
22/08/2024--26/08/2024 |
147 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2556 |
22/08/2024--26/08/2024 |
148 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2557 |
22/08/2024--26/08/2024 |
149 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2558 |
22/08/2024--26/08/2024 |
150 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2559 |
22/08/2024--26/08/2024 |
151 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2560 |
22/08/2024--26/08/2024 |
152 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2561 |
22/08/2024--26/08/2024 |
153 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2562 |
22/08/2024--26/08/2024 |
154 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2563 |
22/08/2024--26/08/2024 |
155 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2564 |
22/08/2024--26/08/2024 |
156 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2565 |
22/08/2024--26/08/2024 |
157 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2566 |
22/08/2024--26/08/2024 |
158 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Const of wirecratesGabionstructure seriesof Tstud at Rd 78224 and Tstud78224 bandha tajowal (2614005093/FP/9989038696) |
2567 |
22/08/2024--26/08/2024 |
159 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80000 and 80150 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073694) |
2654 |
27/08/2024--05/09/2024 |
160 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80000 and 80150 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073694) |
2655 |
27/08/2024--05/09/2024 |
161 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80150 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073699) |
2656 |
27/08/2024--05/09/2024 |
162 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80150 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073699) |
2657 |
27/08/2024--05/09/2024 |
163 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80250 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073702) |
2658 |
27/08/2024--05/09/2024 |
164 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80250 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073702) |
2659 |
27/08/2024--05/09/2024 |
165 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80000 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073741) |
2660 |
27/08/2024--05/09/2024 |
166 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 80000 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073741) |
2661 |
27/08/2024--05/09/2024 |
167 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 79928 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073744) |
2662 |
27/08/2024--05/09/2024 |
168 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Esti for Restreng of Wire Creates stud RD 79928 of 1R bandh along Sutlej at TAJOWAL (2614005093/LD/9989073744) |
2663 |
27/08/2024--05/09/2024 |
169 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Plantation on Side Slope of Bandh Rd 75000 to 85000 at Vill TAJOWAL (2614005093/DP/150262) |
2840 |
10/09/2024--18/09/2024 |
170 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Plantation on Side Slope of Bandh Rd 75000 to 85000 at Vill TAJOWAL (2614005093/DP/150262) |
2841 |
10/09/2024--18/09/2024 |
171 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Plantation on Side Slope of Bandh Rd 75000 to 85000 at Vill TAJOWAL (2614005093/DP/150262) |
2842 |
10/09/2024--18/09/2024 |
172 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Plantation on Side Slope of Bandh Rd 75000 to 85000 at Vill TAJOWAL (2614005093/DP/150262) |
2843 |
10/09/2024--18/09/2024 |
173 |
NAWANSHAHR |
NAWANSHAHR |
TAJOWAL |
W.R Deptt. (Drainage Department) |
Estimate for Plantation on Side Slope of Bandh Rd 75000 to 85000 at Vill TAJOWAL (2614005093/DP/150262) |
2849 |
10/09/2024--18/09/2024 |