State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: DODWADA
Work Code: 1725006023/IF/12 (कपिलधारा कूप सह मेंढ बंधान कार्य पन्‍नालाल दगडु (द)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 13/2/2012 Work start date : 19/2/2012
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 00989 Sanction Date : 16/2/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
105000 45000 0 0 0 0 0 45000 0 150000
Financial Sanction Details
Financial\Administrative Sanction No: don21 Financial\Administrative Sanction Date 19/2/2012
Fin. Sanc. Amt. (in Rs) NREGA:150000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
150000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)65.87127.238380.6401
2Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead20036.67320
3Labour only for item no.040280302400
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)5.52557.614066.8
5False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift88155.913719.2
6Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars15051.77755
7Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil38.4175.32892.273
8Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum57.2297.85596.116
9Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.164450.4573873.8
10Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring chiselling (where blasting is prohibited)31.79221.77047.843
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work4074.92996
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work4076.33052
Total Activity 150000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL.7.38045869.2
2Blasting Holas1457010150
3Cement1250250
4Cement(bori)3630510980
5Centering and Shuttering100888800
6Display board115001500
7Photocopy & staionary1502300
8RR stone (Granite)1100100
9sand (t)5.6683.63828.16
10STEEL100505000
11Transportation charges1500500
Total Material 47300