State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: PALAYCHHA(P)
Work Code: 1703004041/RC/22012034338290 (SUDUR KHET SAMPAK SADAK NIRMAN MADANLAL KE KHET SE SULTAN ALI KE KHET TAK)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2017 Work start date : 18/5/2017
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 153/41 Sanction Date : 10/5/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
720355 764645 0 0 0 0 0 765000 0 1485000
Financial Sanction Details
Financial\Administrative Sanction No: 41/04 Financial\Administrative Sanction Date 15/5/2017
Fin. Sanc. Amt. (in Rs) NREGA:1485000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1485000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil15.6276.91201.178
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.9725044932.88
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2.5:5 (1cement, 2.5 sand, 5metal)16.852854.748101.695
4False work for R.C.C. and P.C.C. work in plinth and foundation50.37147.87444.686
5Double levelling for transfer of bench marks.-Upto15 m interval1.259541192.5
6Transportation of metal 3607.8172.36261061.1316
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.11349013490
8Providing and filling in foundation trenches and at the back of abutments, wing walls etc. and below pipe bed in layers not exceeding 15cm thick including watering and compacting including all lead and lifts.-Selected granular material in filling.1.81016.51829.7
9Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia151535.523032.5
10Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia.63887.623325.6
11Construction of granular sub-base (GSB) by naturally occurred material or river born material or by crushed metal or mixture of two or more, to bring the material in appropriate grading mentioned in table 400.1, (I, II or III) of specifications for rural656.25576.9378590.625
12Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making157533.252290
13Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact3607.8138.4138539.904
14Construction of hard shoulder as per clause 407 of specifications for rural roads (MORD), with soil having CBR value not less than 12, inclusive of all leads and lifts, providing 4-5% camber by tractor mounted grader or labourers, watering at OMC and comp400268.4107360
15Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:187.5504.894650
16Site clearance, cutting grass, raking into heaps and removing off the premises112501.820250
17SIGN BOARD15933.85933.8
18Lossening of hard soil by ploughing the existing gound5182.42.713992.48
19Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed5182.8150259140.5
20contingency125368.8225368.82
212507. KM Stone (A) With Rainforced CC (ii) Ordinary KM Stone211352270
222507. KM Stone (A) With Rainforced CC (ii) 200 M Stone33341002
Total Activity 1485000
S.NoMaterialQuantityUnit PriceTotal
120 MM Graded Metal16.251434.723313.875
22043 soil Compaction material157533.252290
32048-Construction of gravel ba656.25350.07229733.4375
42049-Construction of gravel su187.5277.9752119.375
5BGSY SIGN BOARD15938.85938.8
6Cement9030027000
7Centering and Shuttering50.3762.53148.125
8Compaction of Material3607.8138.4138539.904
9contangency and work charges11259.251259.25
10HumePipes151535.523032.5
11Kilometre Stone (200 M)33341002
12Kilometre Stone (ordinary)211352270
13Loosening Machine Rent5182.42.713992.48
14pf RCC hume pipe 100063887.923327.4
15signs semi providing 600mm x 4122222222
16Transportanion of hard Muram400130.7752308
17Transportation charges3607.8129.43106177.8483
18रेत8.28506970
Total Material 765000