S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Dense or hard soil | 234.38 | 89.6 | 21000.448 |
2 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Hard moorum | 234.38 | 91.3 | 21398.894 |
3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 0 | 0 | 0 |
4 | work charge | 1 | 4600 | 4600 |