Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 01:13:01 AM 
Back  
State: MADHYA PRADESH District: SATNA Block: UNCHAHARA Panchayat: PIPAROKHAR
Work Code: 1712004017/RC/22012034169360 (sakhu lal ke ghar se bhaghan dash kushwaha ke ghar)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 27/1/2014 Work start date : 4/3/2014
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 4242/** Sanction Date : 28/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
108000 72000 0 0 320000 0 0 392000 0 500000
Financial Sanction Details
Financial\Administrative Sanction No: 26/** Financial\Administrative Sanction Date 3/3/2014
Fin. Sanc. Amt. (in Rs) NREGA:180000 Panchparmeshwar
320000
Scheme 2
0
Scheme 3
0
Total
500000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Dag-beling-Double spade "v" shaped stroke 100mm deep3200.4128
3Labour only for item no.04027232.42332.8
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)583014174812
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)602353.7141222
6Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used58406.223559.6
7False work for R.C.C. and P.C.C. work in plinth and foundation228124.328340.4
8Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)1116666
9Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 7213936
10Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 118738614
11Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.21.78227.524955.3856
12Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.103.3252.826114.24
13Transportation of sand51.51785.5240462.1352
14Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.72166.3211975.04
15Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work7573.45505
16Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil5479.94314.6
17Collection of hard moorum including stacking at quarry.72118.38517.6
18work charge11185.19921185.1992
19contingency135003500
20Labour difference in case of old SoR7401410360
Total Activity 500000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL49.31238.1361039.809
240 M.M. METAL54788.1342559.02
3CEMENT(BEGS)627290.89182388.03
4Centring & Shuttering22865.214865.6
5contangency and work charges130003000
6Display board115001500
7Mason Payment (Semi Skilled)5425013500
8mixer machin (perday)128009600
9PhotoCopy & Stationary1453.462453.462
10SAND51.511125.8857994.0788
11Vibrator60855100
Total Material 392000